My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2004-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 1:03:59 PM
Creation date
6/23/2020 6:44:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2007
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_2004-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*Monitoring System Certification <br /> Site Address: 1469E HAMMER LANE Date of Testing/Service: 08/06/2007 <br /> F. in-Tank Gauging /SIR Equipment ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> E]Yes ❑No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> 1fl Yes ❑No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> X❑Yes ❑No* Was accuracy of system product level readings tested? <br /> Eyes ❑No* Was accuracy of system water level readings tested? <br /> X Yes ❑No• Were all probes reinstalled properly? <br /> Eyes ❑No* Were all items on the equipment manufacturers'maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) : ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> 0 Yes ❑No* ❑N/A (Check all that apply)Simulated leak rate: 0 3 g.p.h®0.1 g.p.h ❑0.2 g.p.h <br /> X Yes ❑No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> M Yes ❑No* Was the testing apparatus properly calibrated? <br /> ❑X Yes ❑No* ❑N/A For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑Yes ❑No* ❑X N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑Yes [—]No* a N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> ❑Yes ❑No* M N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> ❑Yes ❑No* 0 N/A For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> MYes ❑No* Were all items on the equipment manufacturers'maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 Based on CA form dated 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.