My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 1:24:34 PM
Creation date
6/23/2020 6:44:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2010
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_2008-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />Page 2 - <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />❑X <br />Tank Manufacturer <br />F-1 Industry Standard ❑ Professional Engineer <br />El <br />Other (Spec) <br />Test Method Used: <br />❑X <br />Pressure <br />❑ Vacuum ❑ Hydrostatic <br />El <br />Other (Specify) <br />Test Equipment Used: <br />Equipment Resolution: <br />no= <br />Piping Run # 3 UNL REG <br />Piping Run # 1 SUP SUP <br />Piping Run # <br />Piping Run # <br />Piping Material: <br />fiberglass <br />fiberglass <br />Piping Manufacturer: <br />smith <br />smith <br />Piping Diameter: <br />311 <br />311 <br />Length of Piping Run: <br />50, <br />5 0 ' <br />Product Stored: <br />UNLEADED <br />SUPREME <br />Method and location of <br />sump <br />sump <br />piping -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />5min <br />5min <br />starting test: <br />Test Start Time: <br />11:57 <br />11:58 <br />Initial Reading (RI ): <br />3psi <br />3psi <br />Test End Time: <br />12:57 <br />12:58 <br />Final Reading (RF ): <br />3psi <br />3psi <br />Test Duration: <br />lhr <br />lhr <br />Change in Reading (RF - N ): <br />0 <br />0 <br />Pass/Fail Threshold or <br />0 <br />0 <br />Criteria: <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.