My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 1:24:34 PM
Creation date
6/23/2020 6:44:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2010
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_2008-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'Ll' 21 t t %t i has successfully completed Bonder <br />Training as forth n the SMITH FIBERCAST Total Quality Installation Program <br />for the installation of UL listed primary and secondary containment products <br />CI i v={ i <br />Date <br />Renewal of the hander cent6cation is (aoommerded every Hilae years a when <br />the speak berdinB pacers hes not been MO"6011 111110114 616 nonft <br />ke'4 FdSt has successfully completed Bonder <br />Training as set forth In the SMITH FIBERCAST Total Quality Installation Program <br />for the installation of UL listed primary and secondary containment products. <br />&1 6 1` <br />Date <br />Renews, of the bordm arlis,,ii ion le nrcornmarded wary three years or when <br />It* speak bonding proom has not been pracaced lot a POW of 6 months <br />a jac ( f ) �e r, has successfully completed Bonder <br />Training as set forth in the SMITH FIBERCAST Total Quality installation Program <br />for the Installation of UL listed primary and secondary containment products. <br />Date <br />Rewe, of the ponder aerolicafain is recommerded every inree years or when <br />the spedoe bonding potess nas not been paclioed for a period of 6 momhs <br />��rerGlassSyStems" ��► <br />`� v Z I ) 91 (u5 has successfully completed Bonder <br />Training as set fonh in the SMITH FIBERCAST Total Quality Installation Program <br />for the Installation of UL listed primary and secondary containment products <br />L-1-4 <br />/ <br />Date <br />Renewal of the border oweldation is redflmmended easy three Yeats Of "nen <br />the speaee bonding process bee no; been paCeced to a period of 6 menths <br />FGiassSys�ems.. a . <br />i�D jryl t ae6 has successfully completed Bonder <br />Training as set forth In the SMITH FIBERCAST Total Quality Installation Program <br />for the installation of UL listed primary and secondary containment products <br />Date <br />bC (C2 t LX ? b i4 41 2- r" % has successfully completed Bo td� <br />Training as set forth In the SMITH FIBERCAST Total Quality Installation Program <br />for the Installation of UL listed primary and secondary containment products. <br />I`G ) <br />Date <br />Renewal of the holder oertdication is recommended easy throe years _4e, <br />Ina specato bdrdap proafss Rae not pawl pardiaed for a mead of 6 months <br />1 I i' i I-) i L -i 1'-f tiX'T, b l e 0 has successfully completed Bonder <br />Training as set nh In the SMITH FIBERCAST Total Quality Installation Program <br />for the installation of UL listed primary and secondary containment products <br />Date <br />Renewal of the bonder owirfioa{on is Iecomnwfoed every Wee years or wnen <br />the specific bording "Gess has not been pnic4oec far a period of 6 moans. <br />FGIasSSystemmw <br />T01H, n <br />1''t.} jt r ()(.�y i(i� has successfully completed Bonder <br />Training as set forth in the SMITH FIBERCAST Total Quality Installation Program <br />for the installation of UL listed primary and secondary containment products. <br />r; ,:1 /ti - <br />Date <br />Renewol of the Idrder oemfidalion n recommended every tnfee yests Of wnen <br />the specific bonding process has not beers padicett for a pared of 6 rnonths <br />1V (I C, W C f 14tJ' � C% has successfully completed Bonder <br />Training as set forth in the SMITH FIBERCAST Total Quality Installation Program <br />for the installation of UL listed primary and secondary containment products <br />Date <br />Ranewrat of ins i'aolder cenificawn Is reoammendea every three years of "nen <br />the speak bonding pocnss has rot pearl pfoalwo for a perW of 6 morons <br />F"�erGlasSSystem5OW <br />' t G{.I`1 + has successfully completed Bonder <br />Training as set forth in the SMITH FIBERCAST Total Quality installation Program <br />for the installation of UL listed primary and secondary containment products. <br />Date <br />Renewal of the bonder nenrficabmn a reaomnen0ed every It-- yeare or when Renewal of the border CertaKaton s rowmmarbed every three yews or when <br />the speak tiofdlrq process has na been padked for 0 period of 6 months. rte speak bondwV process has not been V 2000 101 2 Pal W of 6 manths <br />
The URL can be used to link to this page
Your browser does not support the video tag.