My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 1:24:34 PM
Creation date
6/23/2020 6:44:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2010
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_2008-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F"i^ erGlas a <br />M! }` "'y6( j • �6tWj0LV( has successfully wmptated Bonder <br />Training as set forth K the SMITA FIBERCAST Total Quality Installation Program <br />for the installation of UL listed primary and secondary containment products <br />Date <br />Renewal of the bonder certdaatlon a leramrnefaed every three went or when <br />the speak bonding process has rat been practiaed for a period of 6 months. <br />F"erGIassms u <br />/II�� <br />5 fj) r a e j i ()S has successfully completed Bonder <br />Training as set forth in the SMITH FIBERCAST Total Quality Installation Program <br />for the installation of UL listed primary and secondarycontainment products. <br />♦.fir <br />11..04 <br />Date <br />Renewal of the pander certifi atan a rnrwmrteraed every three years nr when <br />the speak bantling process nas not been practiced for a period of 6 months <br />FiberGlass;sems► <br />Mike t O bleS has successfully completed Bonder <br />Training as set forth in the SMITH FIBERCAST Total Quality Installation Program <br />for the installation of UL listed primary and secondary containment products. <br />Date <br />Renewal of the bonder nxmfiaten a tecow"hoed every three years or when <br />the Speak tending protxss has rot been praarad IM a Pam of 6 months <br />17 : <br />has successfully completed Bonder <br />Training as se orth In the SMITH FIBERCAST Total Quality Installation Program <br />for the installation of UL listed primary and secondary containment products <br />Date <br />Renewal of the berldet oeno6ation is neoomme000 every three years on when <br />the speak bonding process has not been praaioe0 for a pera0 of 6 months <br />Fiber Glass kms wee - <br />i l L v✓n a r )r' " f.{ tS'7 .. has successfully completed Bonder <br />Training as set forth in the SMITH FIBERCAST Total Quality Installation Program <br />for the installation of UL listed primary and secondary containment products <br />Date <br />Renewal of the bonder centlialan is rewmnertded every three years on wean <br />the speak bonding pmaeSS has nal been ptaebad for 0 period of 6 months. <br />GLAl <br />-7-w ..... <br />c' <br />him jy f yft _ has successfully completed Bonder <br />Training as set forth in the SMITH FIBERCAST Total Quality Installation Program <br />for the installation of UL listed primary and secondary containment products <br />Date <br />Renewal of the bonder unihatan a repomrriended every three years ot when <br />this speak bonding process has not Dean praalol d for a period of a months. <br />FiberlGlass fts enw .e . <br />c3 ( , has successfully completed Bonder <br />Training as set forth in the SMITH FIBERCAST Total Quality Installation Program <br />for the installation of UL listed primary and secondary containment products <br />Date <br />Renewal of the bonder aenfiicatwn is recommended every mine years or when <br />the speak bonding process rias nor Ween pracbmd 1 x a pored of 6 mnnths <br />Fiber Glass SYSternw <br />r <br />J has successfully completed Bonder <br />Training as set forth to the SMITH FIBERCAST Total Quality installation Program <br />for the installation of UL listed primary and secondary containment products <br />Date <br />Renewal of live [ander cer ifiaw s recommended event three years or when <br />the Spea6o bandnV process nas not been Packed hs a period 016 month" <br />1K iii ti L C!J) i (ij has successfully completed Bonder <br />Training as aet forth In the SMITH FIBERCAST Total Quality Installation Program <br />for the Installation of UL listed primary and secondary containment products <br />Date <br />Renewal of the bonder cenelatan a recommerxle0 every three years of when <br />the Spears btin ang prooess has not been praa2ed los a Mod of 6 months <br />
The URL can be used to link to this page
Your browser does not support the video tag.