Laserfiche WebLink
06/02/2008 MON 11:53 FAX 2094683433 SJC EHD 0001 <br />June 2, 2008 <br />********************* <br />*** FAX TX REPORT *** <br />********************* <br />k#:h1%1b` L161 -R Uffi" <br />JOB NO. 1399 <br />DESTINATION ADDRESS 94616342 <br />PSWD/SUBADDRESS <br />DESTINATION ID Elite IV <br />ST. TIME 06/02 11:52 <br />USAGE T 01,08 <br />PGS. 4 <br />RESULT OK <br />San Joaquin County <br />Environmental Health Department <br />600 East Main Street <br />Stockton, California 95202-3029 <br />Carrie Miller <br />Elite IV Contractors, Inc. <br />2535 Wigwam Drive <br />Stockton, CA 95205 <br />Fax: (209) 461-6342 <br />Website: www.sjgov.org/ehd <br />Phone: (209) 468-3420 <br />Fax: (209) 464-0138 <br />DIRECTOR <br />Donna Heran, REHS <br />ASSISTANT DIRECTOR <br />Laurie Cotulla, REHS <br />PROGRAM COORDINATORS <br />Carl Borgman, REHS <br />Mike Huggins, RENS, RDI <br />Margaret Lagorio, REHS <br />Robert McClellon, REHS <br />Jeff Carruesco, REHS, RDI <br />Kasey Foley, REHS <br />Sent via Fax and Mail <br />Subject: Conoco Phillips #2705447,1469 E Hammer Lane, Stockton (SR0054401) <br />The San Joaquin County EnvirorUaCataL Health Department EHD has completed the review of <br />the application for permit to per The permit has <br />been approved with the following conditions. <br />Conditions of approval: <br />2. <br />3. <br />4. <br />5. <br />Contact the local fire department, local planning or building department and the San <br />Joaquin Valley Air Pollution Control District for any applicable permits. <br />Any changes shall be submitted to the San Joaquin County Environmental Health <br />Department (EHD) for approval prior to commencing work. All new addenda supercede <br />the previous ones. <br />Contact Garrett Backus (468-2986) to arrange theo0 ow�ection(s) (a 48-hour <br />notice is required): <br />a. A soap test to verify the pipeline integrity. Isolate and pressurize the pipe <br />following the manufacturer's guidelines. <br />If concrete is being broken near the UST, pipeline and tank integrity testing must be <br />performed by a SWRCB licensed tank tester in accordance with the manufacturer's <br />guidelines. Results must be received by the EHD within seven days of returning the <br />facility to operating condition. <br />A11 «a.....,...,.• 1— ,,....a: C,.,l L....« .«.L.«,.«.J,.«a a,.,.a.«,- _3 I—L-1—A <br />