My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 1:24:34 PM
Creation date
6/23/2020 6:44:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2010
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_2008-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. <br />6" <br />150 mm <br />The pipe must be completely surrounded with select <br />backfill (sand, pea gravel ormshe d crushed stone). <br />Eel. <br />i 4: iM NT -1 <br />My ; <br />i 1 <br />In all cases, the pipe must be completely surrounded with <br />select backfill (sand, 1/8" to 314" pea gravel, or 1/8" to 1/2" <br />washed, crushed stone). There should never be voids under <br />or around the pipe. Six inches (150 mm) of the fill must be <br />placed under the pipe as bedding material. Native backfill <br />materials should never be used. <br />TABLE 3. Recommended Minimum Burial Depths Based on Soil Modulus of 1,000 psi or Higher <br />(Refer to ASTM D3839 or AWWA 0950 for thod/Theory) <br />Primary Piping System Installation <br />Min. amount of Sand, Pea Gravel, <br />Pipe Size <br />Compact bacidill carefully over and around the piping <br />TRENCHING AND:BACKIFILLING <br />system. When using tamping equipment, take care to <br />Proper construction of trenches is important. They <br />prevent vibration from driving <br />small stones into the <br />should be wide and deep enough to accommodate the <br />pipe wall. The amount of <br />mm <br />piping and backfill material. See Table 5 for recommended <br />compaction and the type <br />Unpaved <br />minimum burial depths. <br />of soil determines the soil <br />12 <br />305 <br />modulus. Forexample, pea <br />;• <br />• Typically, all piping should slope at least 1/a" (3 mm) per <br />gravel has a typical <br />305 <br />foot toward the tank. Support pipe property to prevent <br />modulus of 1,000 psi with <br />low points. <br />no compaction, while sand <br />R,,;kru must <br />•The g in should be separated by a distance of at <br />requires slight compaction <br />be tamped into <br />shaded areas. <br />I to sk Inches (100 mm -150 mm). For double- <br />(85% r density) to <br />achieve a modulus of 1,000 psi. Refer to ASTM D3839 <br />wad secondary containment piping installations, refer to <br />9 <br />Table 11 on page 18 for proper distances. <br />or AWVVA 0950 for further details. <br />76 <br />3 <br />1. <br />6" <br />150 mm <br />The pipe must be completely surrounded with select <br />backfill (sand, pea gravel ormshe d crushed stone). <br />Eel. <br />i 4: iM NT -1 <br />My ; <br />i 1 <br />In all cases, the pipe must be completely surrounded with <br />select backfill (sand, 1/8" to 314" pea gravel, or 1/8" to 1/2" <br />washed, crushed stone). There should never be voids under <br />or around the pipe. Six inches (150 mm) of the fill must be <br />placed under the pipe as bedding material. Native backfill <br />materials should never be used. <br />TABLE 3. Recommended Minimum Burial Depths Based on Soil Modulus of 1,000 psi or Higher <br />(Refer to ASTM D3839 or AWWA 0950 for thod/Theory) <br />5 <br />Minimum <br />Min. amount of Sand, Pea Gravel, <br />Pipe Size <br />Surface Condition <br />Burial Depth <br />Washed Stone Above Top of Pipe <br />In. <br />mm <br />In. <br />mm <br />In. <br />mm <br />2 <br />50 <br />Unpaved <br />17 <br />432 <br />12 <br />305 <br />Paved, min. 4" (100 mm) asphalt <br />12 <br />305 <br />8 <br />203 <br />Paved, min. 4" (100 mm) concrete <br />9 <br />229 <br />5 <br />127 <br />Paved, min. 6" (150 mm) concrete <br />9 <br />1 229 <br />3 <br />76 <br />3 <br />75 <br />Unpaved <br />20 <br />508 <br />14 <br />356 <br />Paved, min. 4"(100 mm) asphalt <br />13 <br />330 <br />9 <br />229 <br />Paved, min. 4" (100 mm) concrete <br />11 <br />279 <br />7 <br />178 <br />Paved, min. 6"(150 mm) concrete <br />10 <br />254 <br />4 <br />102 <br />4 <br />100 <br />Unpaved <br />20 <br />508 <br />14 <br />356 <br />Paved, min. 4" (100 mm) asphalt <br />14 <br />356 <br />10 <br />254 <br />Paved, min. 4" (100 mm) concrete <br />11 <br />279 <br />7 <br />178 <br />Paved, min. 6"(150 mm) concrete <br />10 <br />254 <br />1 4 <br />102 <br />6 <br />150 <br />Unpaved <br />36 <br />914 <br />14 <br />356 <br />Paved, min. 4" (100 mm) asphalt <br />24 <br />610 <br />10 <br />254 <br />Paved, min. 4"(100 mm) concrete <br />20 <br />508 <br />7 <br />178 <br />Paved, min. 6"(150 mm) concrete <br />16 <br />406 <br />4 <br />102 <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.