My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 1:24:34 PM
Creation date
6/23/2020 6:44:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2010
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_2008-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,Page 2002 Page 1. <br />Secondary Containment Testing Report Form <br />This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the <br />appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and <br />printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1. FACILITY INFORMATION <br />FacilityName: CONOCO PHILLIPS #2705447 <br />1 Date of Testing: 02/22/2008 <br />Facility Address: 1469 E HAMMER LANE STOCKTON, CA, 95209 <br />Facility Contact: MANAGER - TOM <br />Phone: (2 0 9) 478-1522 <br />Date Local Agency Was Notified of Testing: <br />Name of Local Agency Inspector (if present during testing): <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: TANKNOLOGY, INC. <br />Pass <br />Technician Conducting Test: <br />JARROD COOKE <br />Repairs <br />Made Component <br />Credentials: <br />Fail <br />CSLB Licensed Contractor <br />❑ <br />SWRCB Licensed Tank Tester <br />IFR-] <br />License Type: a <br />Manufacturer <br />I License Number: 7 4 316 0 <br />Manufacturer Training <br />Component(s) <br />Date Training Expires <br />tanknology <br />all <br />07/17/2009 <br />❑ <br />❑ <br />Tank Annular 3 UNL <br />X <br />❑ <br />❑ <br />❑ UDC 3/4 <br />x <br />[c�.Yllli I►� /\;�`t17 all Y Df.`711�:� Df.�I1IY1[. <br />Component <br />Pass <br />Fail <br />Not <br />Tested <br />Repairs <br />Made Component <br />Pass <br />Fail <br />Not <br />Tested <br />Repair <br />Made <br />Tank Annular 4 DIE <br />IFR-] <br />❑ <br />❑ <br />❑ UDC 1/2 <br />El <br />❑ <br />❑ <br />❑ <br />Tank Annular 3 UNL <br />X <br />❑ <br />❑ <br />❑ UDC 3/4 <br />x <br />F. <br />❑ <br />❑ <br />Tank Annular 2 PLU <br />X <br />❑ <br />❑ <br />❑ UDC 5/6 <br />E <br />❑ <br />❑ <br />❑ <br />Tank Annular 1 SUP <br />E <br />❑ <br />❑ <br />o <br />UDC 7/8 <br />El <br />0 <br />❑ <br />❑ <br />Secondary Pipe 4 DIE DIE <br />� <br />1-1 <br />1:1 <br />9/10 <br />1:1 <br />❑ <br />❑ <br />1:1 <br />❑ <br />Secondary Pipe 3 UNL REG <br />❑ <br />F` <br />❑ <br />El <br />❑ <br />❑ <br />❑ <br />❑ <br />Secondary Pipe 2 PLU PLU <br />X <br />❑ <br />❑ <br />x <br />El <br />❑ <br />❑ <br />❑ <br />Secondary Pipe 1 SUP SUP <br />❑ <br />� <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Piping Sump 4 DIEIFTI <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Piping Sump 3 UNL <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Piping Sump 2 PLU <br />Q <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Piping Sump 1 SUP <br />E <br />� <br />El <br />El <br />❑ <br />❑ <br />❑ ::[E] <br />If hydrostatic testing was performed, describe what was done with the water after completion of tests: <br />taken water doa <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements <br />Technician's Signature: Date: 02/22/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.