My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 1:24:34 PM
Creation date
6/23/2020 6:44:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2010
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_2008-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 46 <br />SWRCB, January 2002 <br />7. TINDER -DISPENSER CONTAINMENT (UDC) TESTING <br />Page 6. <br />Test Method Developed By: ❑ UDC Manufacturer F] Industry Standard X� Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: F]Pressure Vacuum Hydrostatic <br />F-] Other (Spec) <br />Test Equipment Used: VPLT <br />Equipment Resolution: VPLT TO GPH <br />UDC # 9/10 UDC # <br />UDC # UDC # <br />UDC Manufacturer: bravo <br />Test Start Time: <br />UDC Material: <br />fiberglass <br />Initial Reading (Rl ): <br />UDC Depth: <br />3011 <br />Test End Time: <br />Height from UDC Top to Top of <br />131 <br />Final Reading (RF ): <br />Highest Piping Pentration: <br />Test Duration: <br />Height from UDCTop to Lowest <br />811 <br />Change in Reading (R F - Ri ): <br />Electrical Pentration: <br />Pass/Fail Threshold or Criteria: <br />Condition of UDC prior to testing: <br />good <br />Portion of UDC Tested: 1 <br />1511 <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />-71 <br />A jYes F_]NC]N <br />Yes [:]No❑N <br />❑Yes ❑No❑N <br />F]Yes ❑No[:]N <br />product and water)?* <br />Turbine shutdown response time: <br />2 -5SEC <br />Is system programmed for fail-safe <br />❑ Yes N N <br />—]Yes <br />Yes N N <br />❑ � <br />Yes N N <br />❑ ❑ � <br />❑ Yes No <br />shutdown?* <br />Was fail-safe verified to be <br />onerational?* <br />❑Yes � NoMN <br />❑Yes F—]No❑N <br />Yes L.:-�jNo❑N <br />FI Yes ❑No[:]NN <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />5MIN <br />Test Start Time: <br />14 :34 <br />Initial Reading (Rl ): <br />2.399 <br />Test End Time: <br />14:49 <br />Final Reading (RF ): <br />2.392 <br />Test Duration: <br />15min <br />Change in Reading (R F - Ri ): <br />. 0 0 0 gph <br />Pass/Fail Threshold or Criteria: <br />. 05gph <br />Was sensor removed for testing? III X Yes N NA uYes N NA YesL_JN4__JNAII I Yes LjNol N <br />Was sensor properly replaced and X❑ � ❑ � [:]Yes[:] � ❑ ❑ <br />verified functional after testing? Ye N NA Ye N NA N NA Yes N <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.