My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2011-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2021 1:51:31 PM
Creation date
6/23/2020 6:44:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2012
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_2011-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rA0nUfQ'ctUR00'r1g" Inc, <br /> c�li1 E �$ gs uipwrteri ° okitioeis For Over 20 Years <br /> Mir M <br /> Highest Performance, <br /> Most Requested Mechanical Line Leak Detector Built Today! <br /> Is Any Fuel* <br /> Alcohols, Biodiesel, Aviation, Gasoline, Diesel <br /> • nPump* <br /> Electronic Interface Available . t <br /> • Longest Length Pipeline System* <br /> • <br /> Largest Volume Pipeline stm* <br /> • <br /> Integrated Check Valve / Pressure Reliefw,`" <br /> • Field Adjustable Leak Threshold <br /> • Now Available! Factory Certifications for Installation <br /> and Annual Testing** <br /> The 99 LD-2000 is the most requested mechanical line leak detector built today. New <br /> engineering and the Virzi 2-year warranty (after installation) make the 99 LD-2000 more <br /> attractive to station operators today than ever before. Not only is the 99 LD-2000 less <br /> expensive to own, it is faster and less subject to field and line variables than ever before! <br /> Integrated In-Line Check Valve / Pressure Relief <br /> A leaking check valve in the turbine, defective submersible pump pressure relief, or a defective <br /> bypass valve will allow the line system to depressurize, resetting the leak detector. Drain- <br /> back into the tank and thermal contraction will cause vapor pockets to form. Vapor pockets <br /> increase the length of time it takes for a leak detector to open to full flow. Pump problems <br /> such as these result in slow flow and technical support calls. The resulting service costs and <br /> customer dissatisfaction all take away from the bottom line - making money. <br /> The 9 �D-2000 Is The OnlyMechanical Line Leak Detector <br /> Capable Of Holding Line Pressure After The Pump Is Off, <br /> Even With Pump Component Wear Or Failure. <br /> *See Technical Specifications on last page. <br /> **Contact factory for details <br /> M1;MItI R <br /> PEIR <br /> 4.1 HxneuFNI1sc U.S. Patent No.4,966,190 - Designed and Manufactured in U.S.A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.