My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2011-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2021 1:51:31 PM
Creation date
6/23/2020 6:44:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2012
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_2011-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDER DISPER CONTAINMENT PDC) TESTING <br /> Test Method By: o Manufacturer • Industry Standard o Professional Engr o Other(see below) <br /> Test Method Uses: o Pressure o Vacuum • Hydrostatic o Other(see below) <br /> Measuring Equipment Used: INCON TS-STS (Electronic Sump Test System) <br /> Description Disp#1/2 Disp#3/4 Disp#5/6 Disp#7/8 <br /> UDC manufacturer Bravo Bravo Bravo Bravo <br /> UDC material Steel Steel Steel Steel <br /> UDC depth (inches) 9 9 9 9 <br /> Height from UDC bottom to highest Bottom Bottom Bottom Bottom <br /> piping penetration <br /> Height from UDC bottom to lowest Bottom Bottom Bottom Bottom <br /> electrical penetration <br /> Condition of UDC prior to testing Dry Dry Dry Dry <br /> Portion of UDC tested Entire Entire Entire Entire <br /> Type of shut-down present Float/Sensor Float/Sensor Float/Sensor Float/Sensor <br /> Was sensor removed for testing? <br /> Was sensor properly replaced after testing? <br /> Depth of water level from UDC bottom (in.) <br /> Wait time for water level to stabilize (hr:min) <br /> Test start time <br /> Initial Probe Reading <br /> Test end time <br /> Final Probe Reading <br /> Test duration (hr:min) <br /> Change in water level (±0.0000 inches) <br /> Pass/Fail threshold (±0.0020 inches/}Hr.) <br /> TEST RESULT <br /> Comments: <br /> © 2011 Walton Engineering,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.