My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2011-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2021 1:51:31 PM
Creation date
6/23/2020 6:44:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2012
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_2011-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br />SECONDARY LINE TESTING <br />Test Method By: Manufacturer 0 Industry standard o Professional Engr o Other (see below) <br />Test Method Uses: 0 Pressure C, Vacuum u Hydrostatic o Other (see below) <br />Measuring Equipment Used: Pressure Gauge (range 0tol5prig) <br />Dmorinflan I Ins 94 1 'Ins 4612 1 *- 'U'l I I �A <br />Tank product <br />-Gasoline 91 <br />Gasoline - 89 <br />Gasoline - 87 <br />Diesel <br />Pipe manufacturer <br />Smith <br />8:43 AM <br />Smith <br />Smith <br />Pipe material <br />FRP <br />FRP <br />FRP <br />FRP <br />Primary pipe diameter (inches) <br />2 <br />2 <br />2 <br />2 <br />Secondary pipe diameter (inches) <br />3 <br />3 <br />3 <br />3 <br />Method of seamdary pipe isolation <br />Boot <br />Boot <br />Boot v <br />Boot <br />Location of secondary pipe notation <br />Sump <br />Sump <br />Sump <br />Sump <br />Estimated langth of piping run (feet) <br />255' <br />245' <br />215' <br />200' <br />(include t!e of branch runs) <br />PASS <br />PASS <br />PASS <br />%o <br />PASS <br />Wait fime for pressure to stabilize (hr:min) <br />0:05 <br />0:05 <br />0:05 <br />0:05 <br />Test start -time <br />8:34 AM <br />8:43 AM <br />10:00 AM <br />8:54 AM <br />—initial Pressure (PsiQ)___ <br />5.0 <br />5.0 <br />5.0 <br />5.0 <br />Test and time <br />9:34 AM <br />9:43 AM <br />11:00 AM9:54 <br />AM <br />Final pressure (psiq) <br />5.0 <br />5.0 <br />5.0 <br />Test duration (hrmin) <br />1:00 <br />1:00 <br />W 0:00 <br />0:00 <br />Change in pressure (psiq) <br />0,0 <br />0.0 <br />0.0--- <br />0.0 <br />Pass/Fail threshold (pat) <br />01 <br />01 <br />0.50.5 <br />TEST RESULT <br />PASS <br />PASS <br />PASS <br />%o <br />PASS <br />Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.