My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2011-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2021 1:51:31 PM
Creation date
6/23/2020 6:44:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2012
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_2011-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDER DISPER CONTAINMENT C TESTING <br />Test Method By: O Manufacturer • Industry Standard o Professional Engr o Other (see below) <br />Test Method Uses: O Pressure O vacuum • Hydrostatic o Other (see below) <br />Measuring Equipment Used: Caldwell Sump Tester <br />Description Diso # 9/10 <br />UDC manufacturer <br />Bravo <br />UDC material <br />Steel <br />UDC depth (inches) <br />9 <br />Height from UDC bottom to highest <br />piping penetration <br />Bottom <br />Height from UDC bottom to lowest <br />electrical penetration <br />Bottom <br />Condition of UDC prior to testing <br />Portion of UDC tested <br />Type of shut -down present <br />Float/Sensor <br />Was sensor removed for testing? <br />Was sensor properly replaced after testing? <br />Depth of water level from UDC bottom (in.) <br />Wait time for water level to stabilize (hr:min) <br />Test start time <br />Initial Probe Reading <br />Test end time <br />Final Probe Reading <br />Test duration (hr:min) <br />Change in water level (± 0.0000 inches) <br />Pass/Fail threshold (±0.0020 inches / i Hr.) <br />TEST RESULT <br />Comments: <br />0 2011 Walton Engineering, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.