Laserfiche WebLink
IED PROGRAM CONSOLIDATED FO <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- (Pae 1 of 2) <br /> TYPE OF ACTION El 1.NEW PLAN ® 2.CHANGE OF INFORMATION -190-1. <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) t. <br /> BUSINESS NAME(Same as Facility Name or DBA) 3. <br /> CRLLC #2705447 <br /> BUSINESS SITE ADDRESS 1469 E HAMMER LN 107 CITY STOCKTON 104 <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> by the equipment manufacturers'instructions,or annually,whichever is more frequent.Such work must be performed by qualified personnel.[23 CCR§2632,2634,2638,2641) <br /> ........ ...... ...... _.... <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY El99.OTHERS eci 490-3a. <br /> ( p �)� 490-36. <br /> III. MONITORING LOCATIONS <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ® 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632,2634] 490-4. <br /> IV. `TANK MONITORING IS PERFORMED USING THE FOLLOWING METHODthat <br /> (Check <br /> Ill <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,2634] <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-6. <br /> PANEL MANUFACTURER: Veeder Root 490-7. MODEL#: TLS-350 W/ISD 490-8. <br /> --.'"- <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-9. MODEL#(S) ___ .` 490-10. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).[23 CCR§26431 490-11. <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13. <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17. <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHER(Specify): 490-1s. <br /> g•p g.p.h. 490-19. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR§2646.1) <br /> ago-2o. <br /> ........ ....._.. ....................._-........................_...... ........... .................. ........... ............... ................................................_. ..... __... ........a9021. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)123 CCR§2645) TESTING PERIOD. ❑ a.36 HOURS ❑ b.60 HOURS 490-22. <br /> .............................................-.......... <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR§2643.11 490-23. <br /> TEST FREQUENCY: r' a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): ag490-24.2s24. <br /> ..................................................................__..._....__...._._..._.. __...._.__.._................................._........................................................._...._........................ <br /> ❑ 99.OTHER(Specify): 490-26. <br /> ago-27. <br /> ll <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) that <br /> l) - <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-28. <br /> (23 <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED 11c.PRESSURIZED ❑ d.UNDER VACUUM 490-z9. <br /> PANEL MANUFACTURER:Veeder Root 490-30. MODEL#: TLS-350 W/ISD 490-31. <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-32. MODEL#(S): 208 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. Im a.YES ❑ b.NO 490-34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ❑ b NO 490-3 1 5 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCR§26361 <br /> MLLD MANUFACTURER(S): / *x' 490-37. MODEL#(S): /l�9�38. <br /> _..__ - .. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§26361 490-39. <br /> ELLD MANUFACTURER(S): 490-40. MODEL#(S): 490-41. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 49042. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-43. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 491-44. <br /> _._....... -._..... ......... .. ................._.. .. .... ..._._.. .. ......... ......... ......... . _...._..... --._._..._.. ........... _. <br /> ❑ 4.PIPE INTEGRITY TESTING. 490-45. <br /> FREQUENCY: r__ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHERS eci 490-46. <br /> TEST FRE <br /> Q (Specify) .....- <br /> ❑ 5.VISUAL PIPE MONITORING. 49048. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY y c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490-49. <br /> __. *All owed.for monitoring ofunburied emergency generator_fuel piping only per HSC,§25281,5(6)(3)_ <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(ax3)) 490-50. <br /> ...................... ....I ..- .......1 ... ._ ..... <br /> ...... <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51. <br /> _...._.......... . .... ......................._................................................._..__..__...... .................. <br /> ❑ 99.OTHER(Specify) ago-sz. <br /> 490-53. <br /> UPCF UST-D(1212007)-1/3 www.unidocs.org <br />