My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2011-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2021 1:51:31 PM
Creation date
6/23/2020 6:44:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2012
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_2011-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UL/ULC Listed Red ThreadO IIA Piping System <br />Benefits of <br />Fiberglass Piping <br />in Underground <br />Fuel Applications <br />TIME TESTED <br />• 30 -Year Warranty <br />• Installed since 1964 <br />• Never been removed dues <br />to fuel incompatibility <br />• Total immersion testin <br />in fuels <br />• Case History G7301 <br />LOWEST TOTAL CO <br />JF OWNERSHIP <br />f <br />• No reinstall costs due <br />. to fuel incompatibility <br />• Homogenous system <br />liner, no bladder <br />no <br />• Exceptional Flow <br />A TRUE PIPE IN A PIPE Characteristics - Two-inch <br />Lowest Total Cost Ownershipt <br />[Material Cost + Installation Cost] _ System Life <br />t Maintenance cost and replacement cost not required with RED THREAD IIA piping system. <br />•Thirty <br />Year <br />Warranty* <br />, With over 40 <br />(years proven <br />performance in <br />the marketplace, <br />Jnderwriter's <br />Laboratories, Inc. <br />and Underwriter's Laboratories <br />Canada (UL/ULC) Listed RED <br />THREAD IIA pipe, fittings and <br />adhesive cant' a 30 -year warranty. <br />The product is warranted to be <br />free from defects in material and <br />workmanship—and against internal <br />and external corrosion—when used <br />for underground transportation of <br />fuels. <br />• Leak Prevention — Sump <br />entry/termination fittings provide <br />positive seal at the sump to help <br />prevent leaking of underground <br />fuel in or out of the sump. This <br />fitting also helps provide Class <br />I (leak prevention) protection <br />which complies with California's <br />requirement for continuous <br />interstitial monitoring of the piping <br />system's secondary containment. <br />• Interstitial space <br />communication <br />• Leak prevention, not <br />leak detection <br />• INSTALL /T, BURY IT, <br />FORGET IT! <br />2 <br />RED THREAD IIA pipe has the <br />largest I.D. (2.235") in the fueling <br />industry—allowing you to sell twice <br />the fuel per foot than any 11/2" <br />flexible product on the market. <br />Three-inch RED THREAD IIA <br />fiberglass pipe has a nominal 3.36" <br />I.D.; four -inch pipe has a 4.36" I.D. <br />• Outstanding Corrosion <br />Resistance — RED THREAD IIA <br />piping systems resist internal and <br />external corrosion from hazardous <br />soils, fuels and other corrosive <br />fluids. <br />• Quality Assurance — RED <br />THREAD IIA quality assurance <br />procedures meet or exceed the <br />test requirements of UL/ULC. <br />• Permeability — RED THREAD <br />IIA permeability resistance <br />greatly exceeds UL allowable <br />permeability. <br />2004 UL 971: <br />Primary -1 gm/m2/day <br />(0.053 gal/100 ft. of 2" pipe, <br />30 days) <br />Secondary - 4 gm/m2/day <br />(0.213 gal/100 ft. of 2" pipe, <br />30 days) <br />1995 UL 971: <br />Primary - 4 gm/m2/day <br />(0.213 gat/100 ft. of 2" pipe, <br />30 days) <br />Secondary - 24 gm/m2/day <br />(1.278 gal/100 ft. of 2" pipe, <br />30 days) <br />Old vs New - Pipe in the foreground was <br />installed in 1973 and removed 27 years <br />later when the station closed. <br />*Please review Fiber Glass Systems' written warranty to determine the terms and conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.