My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2011-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2021 1:51:31 PM
Creation date
6/23/2020 6:44:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2012
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_2011-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
has successfully completed Bonder -Training as set forth in the <br />Fiber Glass Systems' Total Quality Installation Program for the <br />installation of UL listed primary and secondary containment <br />products, I?A—�7& <br />Date <br />Renewal of the bonder certification is recommended every three years <br />or whenthe specific bonding process has not been practiced for a <br />period of six months. <br />T r/ Ir"M <br />M <br />has successfully completed Bonder Training a9,A$ forth in the <br />Fiber Glass Systems' Total Quality Installation Program for the <br />installation of U1, listed primary and secondary containment <br />products. ZO <br />Date <br />Renewal of the bonder certification is recommended every three years <br />or when the specific bonding process has not been practiced for a <br />period of six months. <br />has SUCCCSSfUlly completed Bonder Training as set forth in the <br />Fiber Glass Systems'Total Quality Installation Program for the <br />installation of UL listed primary and secondary containment <br />products. 12 !i <br />, 6ate <br />Renewal of the bonder certification is recommended every three years <br />or when the specific bonding process has not been practiced for a <br />period of six months. <br />Fiber Glass Systems (Smith Piping) <br />has successfully completid Bonder Training assetforth in the <br />Fiber G ass Systems' Total Quality Installation Program for the <br />installation of UL listed primary and secondary containment <br />products. 1 —'7 /' L <br />bite, <br />Renewal of the bonder certification is recommended every three years <br />or when the specific bonding process has not been practiced for a <br />period of six months. <br />has successfully cortipleted Bonder Training as set forth in the <br />Fiber Glass Systems' Total Quality Installation Program for the <br />installation of UL listed primary and secondary containment <br />products. 12 <br />O=q <br />Date <br />Renewal of the bonder certification is recommended every three years <br />or when the specific bonding process has not been practiced for a <br />period of six months. <br />NW Mwiftiss System <br />has successful y completed Bonder Training as set forth in the <br />Fiber Glass Systems' Total Quality Installation Program for the <br />installation of UL listed primary and secondary containment <br />products. i <br />IJ <br />Date <br />Renewal of the bonder certification is recommended every three years <br />or when the specific bonding process has not been practiced for a <br />period of six months, <br />MW FdwejassSyMem <br />11-TLIA A a�t a- re -f'1 L-,1. Jr. <br />has successfully completed Bonder(Utlining as set forth in the <br />Fiber Glass Systems' Total Quality Installation Program for the <br />installation of UL listed primary and secondary containment <br />products. 12-12-'qllb <br />Date <br />Renewal of the bonder certification is recommended every three years <br />or when the specific bonding proms has not been practiced for a <br />period of six months. <br />has successfully completed Bondeffraining as set forth in the <br />Fiber Glass Systems' Total Quality Installation Program for the <br />installation of UL listed primary and secondary containment <br />products. � ?�:/ <br />Date <br />Renewal of the bonder certification is recommended every three years <br />or when the specific bonding process has not been practiced for a <br />period of six months. <br />has successfully completed Bonder Training ai set forth in the <br />Fiber Glass Systems' Total Quality Installation Program for the <br />installation of UL listed primary and secondary containment <br />products. 0 <br />Date <br />Renewal of the bonder certification is recommended every three years <br />or when the specific bonding process has not been practiced for a <br />period of six months. <br />11 <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.