Laserfiche WebLink
opa`uvl'" c <br />SAN JOAQUIN COUNTY <br />Q` �a ENVIRONMENTAL HEALTH DEPARTMENT <br />600 East Main Street, Stockton, CA 95202-3029 <br />Telephone: (209) 468-3420 Fax; (209) 468-3433 Web: www.sigov.org/ehd <br />C9i%FOR�`P <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility Name: <br />Inspection Date: <br />Leak detector <br />❑ <br />Facility Address: <br />Service Request #: <br />/ 46,q L ��.F ., <br />�!L ofl 6z c>--> L - <br />Onsite Service Technician's Name: <br />ICC Servic®ian/Installer Exp. Date: <br />Manufacturer Training: / 4+ <br />❑ <br />-X — <br />4ecr- X - ► i 6 <br />SERVICE <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ line test programmed <br />❑ <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ <br />❑ line test programmed <br />�Jor covr�v�� <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />}/�'. <br />j�dCt� [i •, ' (G1 . <br />❑ fail safe Serial #: <br />LY RATE. <br />❑ NA <br />I 7eiv��� <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />❑ This UST facility is APPROVED to operate <br />SERVICE <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />�Jor covr�v�� <br />minutes <br />-/ <br />B�i' �l N G 511` I 'IAV► I,.� •.s <br />Secondary containment testing for: <br />}/�'. <br />j�dCt� [i •, ' (G1 . <br />ro UDC(s) Piping <br />LY RATE. <br />Sump(s) UST(s) <br />I 7eiv��� <br />Testtii�njg for the above components are next due by: <br />I Title: <br />Note: Plelse be that 2° containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />❑ This UST facility is NOT APPROVED to operate <br />EHD 23-04 <br />Rev 10/06/1 <br />UST SERVICE REQUEST INSPECTION REPORT <br />f� 1 <br />i O.41L a.AC.3 /L'r-v -4 ►1 <br />�Jor covr�v�� <br />-/ <br />B�i' �l N G 511` I 'IAV► I,.� •.s <br />rl <br />W�^ K l o -5e C lr �l 1, G` <br />}/�'. <br />j�dCt� [i •, ' (G1 . <br />THIS FACILITY IS SUBJECT fO REINSPECTION AT AO TIME AT EHD'S CURRENT HOU <br />LY RATE. <br />EHD In r: <br />I 7eiv��� <br />I Title: <br />EHD 23-04 <br />Rev 10/06/1 <br />UST SERVICE REQUEST INSPECTION REPORT <br />