My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2011-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2021 1:51:31 PM
Creation date
6/23/2020 6:44:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2012
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_2011-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ ,. <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of3sets ofplans&applications aaoriginals will beretained byEH[) <br /> 1. Site map enclosed? YES [3 N(} [] <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan" ioavailable onthe jobeiteasrequired byTitle 8. <br /> 3. Detailed description ofwork tobecompleted. List components toberepaired nrreplaced and attach adiagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (|f <br /> adding piping. UDC'o, or other UST equipmant, or performing bank top upgnyde, use the UST Installation Application <br /> pages 4-8asnecessary for otimely plan review): <br /> Replace 91 SC with like-for-like OPW SC for: adjacent concrete repairs. <br /> Schedule inspection with County Inspector and perform final testing of <br /> repaired 91 SC and provide reports to CUPA and Owmoer. <br /> 4. List ofequipment hobeused (Attach manufacturer's specification sheets showing third-party appnovo|): <br /> O2W direct bury 2100 series spill container <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.