My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2011-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2021 1:51:31 PM
Creation date
6/23/2020 6:44:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2012
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_2011-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attestation No. P 5882 Attestation No. P 5879 Attestation No. P 5878 <br /> Kevin Graf Juan Delgada Jessie D. Andrada <br /> Walton Engineering Inc, Walton Engineering Inc. Walton Engineering Inc. <br /> d Installation Training for EVR Phase I by O A Installation Training for EVR Phase I by O ed Installation Training for EVR Phase I by Ol <br /> Dn: 10/2/2010 Exp Date: 10/2/2012 On: 10/2/2010 Exp Date: 10/2/2012 On: 10/2/2010 Exp Date: 10/2/2012 <br /> fb*training course does not create a warranty or guaranty by oPW ol'your i 2fthis training course d notcreate a warranty orguaranty by oPVYofyour, ofthis training course does not create a warranty or guaranty by DPW ofyour it <br /> --ante ,vapor neivy systems and EVR I systems This&I tenance dr zzles,vapor raWwgsystems and EW PHASE This tr ;&-v�ce ofnozzles, edvapto <br /> a system and EVR 7 This tea <br /> tot eliminate the need to strictly adhere to manufacturardn Ions and pion not eliminate the need to adhere to man turer w and snot ediminate the need to ata r adhere to rrranuf Curer Instructions and prose <br /> mafntafnlrrg nozrtes vapor recovery andEW PHASEI Systerrrs ANr d rnaintar'ning nooks vapor r very s and EVR PHASb I5y5tems Ali, id maintaining noutes,vapor recovery systems and EVR PHASE S All n <br /> systems and EVIL PHASE Systems must be Instaled and maintained in aec< >ry systems and EVR PHASEI Systems must be installed and maintained in acc 'cry systems and EVR PHASEI Sysesta <br /> ymust be installed and maintained in aced <br /> instructions and procedures,A tiorr aAa*S oNL Y to tested named incr k r instructions and procedures:Attestation applies 0M Y to tested named indivk er Instructors andpraedures.Attstat on app/ies ONt Y to tested Warned individ <br /> Attestation No. P 60C =10Attestation No. P 5871 mb iW Attestation No. P 600; <br /> Gerardo Guzman Jr. "D` Isaac Diaz Curtis Carpenter <br /> Walton Engineering Inc. Walton Engineering Inc. Walton Engineering Inc, <br /> ,d Installation Training for EVR Phase I by I Installation Training for EVR Phase I by OF J Installation Training for EVR Phase I by{ <br /> On:2/1/2011 Exp Hate:2/1/2013 in: 10/2/2010 Exp Date: 10/2/2012 3n:2/1/2011 Exp Date:2/1/2013 <br /> if&&trafn&v mum dMnotemte a warranty aryveraAy4'a*wafyn Ws training course does not create a warranty or guaranty by 00WWof your in; <its bovi fay cmw do m not croak a Warranty orpuaranty0OPW afyou <br /> �. ranee of vapor r overys and EVR I systems This trail � y aW M I sy <br /> Mm stems: Ms <br /> aapar>t ► rYsystprtzs arxf SVR I 7hb nonce of wWr tem s <br /> e/Imin .the 1G iT artYlw ehmfnate the nit to strxtty adhere to manufacturerrmstF I Syns and AlIfto Rt elibwhi the nwd to sb1(*ad&m to moofm vA and <br /> !►� <br /> lmtln bT!• narntarnng nozzt�vapor rwvwys and R PHASEI Systems All no <br /> rq nafz f and Et�R I + . malntalnfiignaarks,va/7or syenisand LrlrR PlfrtSE1 <br /> tYsyster�apd EUR PK4SE 15 systems and EVR PHASEI systems must be installed and maintained in attar; �Inttst pe Irts�lkd end rrlrtlntdf,7etl/n ac <br /> 1 mtut tae rlA57aNCrI and petal»t�►lned a ostructions and proreduresAtte5tation applies LWt Yto tested named individu r BndEYR PhG4S�2 <br /> 'lnstnurtiorrs and pro�c6durrs.Attesbttori ams A�VEYto Ie�rl rtamecflnd tnslntcAcns and p�o�cedurrs AtA�tation aper�s OW4YtP Aeslyd nempd lrtctit <br /> Attestation No. P 5875 Attestation No. P 5872 Attestation No. P 5884 <br /> Jimmy Hamblen Steven Flores - David Delgado <br /> Walton Engineering Inc. Walton Engineering Inc, Walton Engineering Inc. <br /> A Installation Training for EVR Phase I by O d Installation Training for EVR Phase I by O 'd Installation Training for EVR Phase I by OF <br /> On: 10/2/2010 Exp Date: 10/2/2012 Dn: 10/2/2010 Exp Date: 10/2/2012 On: 10/2/2010 Exp Date: 10/2/2012 <br /> rf this training course does not create a warranty orguaranty by DPW of your, f this train course does not create a warranty orguaranty by oPW of your tfthrs training course does not create t warranty orguarby DPW of your in: <br /> eirance oFnoz*s,vapor moo verysys and EVR PHASE I system77rrs h, a rance ornozdles,v recoveryso and EVR I systems. This tr tenanee of vapor recovery shag and EVR !;E I ansa This teal, <br /> prom <br /> not elfmtnate the to sbktly re to man rerinstruc' and pros notellri rate theneed to strictly ad to manufacturer instrurtxwwand proc not eliminate the need to vasftpor <br /> adhere to m a darturerrn tions and <br /> f maintaining nozr*vapor and EW P 1 S`ystams. Alf, e maintaining nozzles.vapor recoverysystems and E`VR PHASE Systems. All, d maintaining a n vapor and EVR andPHAImiE I SysnedItem All no <br /> YY sYstems and EVR PHASE Swirms most be insta and maintaLnedin ace ms and PHASE I S must be insta and maintained in acc � tb and EVR redumsSystems must be Installed andste ntamed in acro! <br /> rY sySte Ys r irt#rurtidns and res.Attestation applies OIIL Yto rested name-'fndivftJu <br /> -instructionsandprocedures:AttestjtwnappliesOMYtote#ednanWtnaivit •instructions and procedures.A tion applks Y to tested Wan fndiva <br />
The URL can be used to link to this page
Your browser does not support the video tag.