Laserfiche WebLink
i <br /> K. Float and Chain Equipment: ❑ Check this box if floats and chains are not present at this site. <br /> ® Check this box if float and chain equipment is installed but only as <br /> secondary leak detection. <br /> This section must be completed if floats and chains are used to perform leak detection monitoring. <br /> Complete the foll wing checklist: <br /> ❑Yes ® No* Were all float and chain equipment properly inspected and tested for correct functionality? <br /> ❑Yes ® No* Were all float and chain equipment certified to be working properly? <br /> *In the Section M,below,describe how and when these deficiencies were or will be corrected. <br /> L. Impact Valves: ❑ Check this box if impact valves are not installed. <br /> Complete the following checklist: <br /> ®Yes ❑ No* Were all impact valves properly inspected and tested for correct functionality? <br /> ®Yes ❑ No* Were all impact valves certified to be working properly? <br /> *In the Section M,below,describe how and when these deficiencies were or will be corrected. <br /> M. Comments: <br /> 1.ALL UDCS ARE EQUIPPED WITH CHAINS AND FLOATS BUT FOR SECONDARY LEAK DETECTION ONLY. <br /> STAND ALONE SENSORS INSTALLED FOR PRIMARY LEAK DETECTION. <br /> Page 5 of 5 <br /> Monitoring System Certification <br />