Laserfiche WebLink
v <br />ARCO Facility <br />is <br />Fa <br />EN <br />il• 1 • tl 1 1 • <br />• <br />D a W • ► li �I;L•I� <br />accordanceTanks - Monthly Inventory Reconciliation and Annual Tank Integrity Testing in accordance <br />with Sections 2646 and 2643(c)(2)(A) and (B), Article 4. Title 23, CCR. <br />Unes - Automatic Pressure Une Leak Detectors and Annual Une Tightness Testing in <br />- <br />MONITORING EQU'i1 \l <br />instructionsThe Automatic line leak detectors will be maintained and inspected according to the <br />by an outside contractor once during each calendar <br />MONITORING Pr r •`E - Inventory Reconciliation <br />inventory reconciliation will be performed In compliance With the details of Section 2646, <br />Article 4, Title 23, CCR (copy attached and hereby incorporated). <br />A. The daily variation in inventory reconciliation shall be the difference between <br />physically measured inventory in storage and the calculated inventory in storage. <br />B. The physically measured inventory shall be determined at approximately the same time <br />each day by taking liquid level measurement (stick reading) and converting it to <br />gallons : •a calibrationchart. <br />a The calculated inventory shall be determined at approximately the same time of day for <br />each business day by adding the inputs and subtracting the withdrawals from the <br />physically measured inventory determined the day before. <br />D. These variations shall be summed for a period of one month. Monthly variations <br />exceeding a variation of 1.0 percent of the monthly tank delivery plus 130 gallons <br />must be investigated in accordance with instructions attached. <br />•.. .:: i•:: f:: • <br />