Laserfiche WebLink
C <br />i 1 4 <br />n <br />In addition to the training covering subjects mentioned in Sections• 4 above,• <br />needed for the operation of the tank system and monitoring equipment includes: <br />• to: <br />- Take tank level measurements <br />#dispenser <br />Inspectequipment <br />- Recognize warning signs: dispenser hesitations, meter spins and odors <br />- Manually closedispenser impact <br />Replace dispenser <br />Shut down the system with and location of : ARCOmatic switch, electrical pan <br />breakers, and emergency shut off switch <br />Test the electronic monitor <br />Written records of all monitoring, testing, and maintenance performed shall be maintained <br />on-site or off-site at a readily available location for a period of at least 3 years. These <br />records must be made available, upon request within 36 hours, to the local agency or the <br />Board. <br />