Laserfiche WebLink
aOARO OF TRUSTEES <br />James Culbertson. Pres. <br />Poldcla E. Vannuccl, Ssc'y <br />Anthonette van Spronsen <br />Earl Pimenlel <br />Fern Supbee <br />Daniel L. Flores <br />John 0. Most, M.O. <br />William J. Wada <br />Mary Anna Low <br />Facility Name <br />- [no Im <br />SAN JOA UIN LOCAL HEALTH DISTRICT { SERVING <br />� E NO <br />City of Lodi <br />1601 East Hazelton Avenue, P. O. Box 2069 San Joaquin County <br />StoGlcton, Californiaaliity of Escalonla 95201 City of Manteca <br />209/466-6781 City of Ripon <br />City of Stockton <br />City of Tracy <br />Jopi Khanna. M.O.. M.P.H., District Health Officer San Joaquin County <br />San Joaquin County <br />Qco <br />Date of Inspection —c( Inspector rrvo-( C. -Ce r i <br />MONITORING ALTERNATIVE #7 <br />Limited to underground storage tanks which have infrequent inputs and withdrawals and <br />where the liquid level in the tank can be measured to an accuracy of +5 gallons or less <br />when the tank is half full. <br />This monitoring alternative shall include: <br />V --Annual precision test on tank and piping. <br />VTank gauging performed as follows: <br />Tank must be capable of being secured to prevent unauthorized inputs and <br />withdrawals. <br />('/Tank must have no inputs or withdrawals for at least a 48 hour period <br />(.2 days) at the end of consecutive periods lasting up to 7 days. <br />/ (For example: tank in use Monday through Friday, then locked <br />c/ over weekend). <br />Liquid level measurements are taken at the beginning and end of the <br />monitoring period (lasting at least 48 hours). <br />(For example: level measured and recorded Friday night before <br />locking and again on Monday morning before opening.) <br />�If liquid level varies more than 10/ of the tank volume or 5allons, which <br />g <br />ever is less, between measurements, an unauthorized release shall be <br />assumed to have occurred and shall be reported to the local agency within <br />24 hours, as per Article 5, Sect: 2652 of the regulations and further <br />evaluations shall be performed to verify or disprove the variations. <br />Implementation of the monitoring alternative requires that the following circled items be <br />completed by the dates specified. <br />1. Precision test(s) must be performed by and results submitted to this <br />office within 30 days of the test. <br />Tank gauging must be started immediately. (See instructions above). <br />If the above compliance dates cannot be met, contact this office prior to the specified <br />date. <br />4/86 UGT 3 <br />