Laserfiche WebLink
14. ARCO #548, 1612 Hammer Ln /Rrentvnnd , <br />Stac tn" CA <br />� of �: <br />r <br />Nam@ of Supplest. Owner of Dealer Address No. and Street($) City State <br />Date or Test <br />Via <br />15. TANK TO ST 16. CAPACITY <br />am <br />. Station Chan <br />Nominal Capacity <br />6y most accurate <br />capacity chart available <br />Tank Manufacturer's Chan <br />ben�I,poaltbn <br />Gallons------- <br />Gallons Gallons <br />J Company Engineering Data <br />Is there doubt as to <br />True Capacity 7 ® <br />J Charts supplied with •ro <br />InM <br />and GIs#* See Section "DETERMINING TANK CAPACITY" <br />i�Other - �a(1 d�t.�X7%tCs' <br />11. PILE-UP FOR TEST <br />Stick Readings <br />to W in. <br />Total Gallons <br />Gallons ea. Reaad-inngg <br />Stfok wow softomInventory <br />I , /��,� p, � <br />W�wt"'s <br />before Fl" _.� _ <br />to % in. Gallons <br />Fill up. STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY OLIANTITY <br />;7- <br />Tank DI~0r l j ry <br />Product In full tank (up to fill pipe) _ <br />18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK <br />VAPOR RECOVERY SYSTEM <br />Sae manual saetions applicable. Check below and record procedure in log (26). <br />Stage I <br />® Water in tank ® High water table M tank excavation <br />F� Line(s) being tested with LVLLT <br />Stage 11 <br />21. TEMPERATURE/VOLUME FACTOR (a) TO TEST THIS TANK <br />19. TANK MEASUREMENTS FOR <br />Is Today Nhrmer? I J Colder? I ; —° F Product in Tank _• F fill -up Product on Truck _' F Expected Change i or I <br />TETT ASSEMBLY •1 <br />to Grade'.................... / " <br />i �)c"��% 5 <br />�__J_t <br />IF <br />BoRm of tank ........ . <br />22. Thermal -Sensor reading after circulation -_ <br />Add W for 4" L <br />for L <br />digits <br />23. Digits •F In range of expected change �L <br />Nearest <br />Add 24" Y or aM seal ....... �,/ �_" <br />�x--f <br />per <br />�$ <br />Total tubing to assembler Approximate . --1e --„ <br />�AooOS3o �,,, <br />07- ZO/i�KS� Rens <br />24' X a <br />ofor <br />20. EXTENSION HOSE SETTING <br />total quantity M coefficient of expanston <br />volume change in this tank <br />Tank top to grade° .................................. T " <br />full tank (16 or 17) Involved product <br />per •F <br />Extend hew on suctba tube 6" or "we <br />i <br />PIZ-ZO/gQ� <br />® 000DG y� tl1 X06 This is <br />b.bar tank top .....................................25. <br />25. + a <br />volume change per •F (24) Ofg(ts per •F in test <br />Volume change per digit. test <br />*It Fill pipe extends above grade, use top of fill. <br />Rainge (23) <br />Compute to 4 decimal places. factor (a) <br />OBSERVED GRAVITY <br />OBSERVED TEMPERATURES 59# <br />CORRECTED API GRAVITY <br />C. 0. E. <br />