My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
2300 - Underground Storage Tank Program
>
PR0231127
>
COMPLIANCE INFO_1986-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 12:21:10 PM
Creation date
6/23/2020 6:44:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1996
RECORD_ID
PR0231127
PE
2361
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
01
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231127_1612 W HAMMER_1986-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
529
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. ARCO #548, 1512 Hammer Lane/Brentwood, Stockton, CA /e)®/ �& <br />Nemo of $mopewr. Own" or Dftw Address No. and Street(s) City Sute Onto of Tost <br />15. TANK TO TEST <br />16. CAPACITY <br />Nominal Capacity &IaQ <br />Gallons <br />to"*" by poafeoft <br />Is there doubt as to True Capacity T <br />nne and rad Sao Section "DETERMINING TANK CAPACITY" <br />17. FILL -UP FOR TEST <br />L <br />From <br />Station Chart <br />By most "curate Tank Manufacturer's Chart <br />capacity chart available <br />Gallon J Company Engineering Data <br />L_j Charts supplied with <br />M <br />Other <br />Stick Readings Total Gallons <br />to % In. Gallons ea. Reading <br />Inventory — <br />FM up. STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY OUANTITY <br />X 2— <br />Tank Dilanwhier <br />Product In full tank (up to fill pipe) <br />— <br />18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK <br />VAPOR RECOVERY SYSTEM <br />Soo manual sections applicable. Cheek below and record procedure in log (26). <br />Stage I <br />® Water in tank ® High water table In tank excavation <br />❑ Line(s) being tested with LVLLT <br />❑ Stage II <br />21. TEMPERATURE/YOLUME FACTOR (a) TO TEST THIS TANK <br />19. TANK MEASUREMENTS FOR <br />Is Today Warmer? i I Colder? I ; _• F Product in Tank _' F Fill -up Product on Truck _.' F Expected Change I - <br />or 1 <br />TETT ASSEMBLY <br />Bottom tank to Gratia• /---7--" <br />e) to <br />6 Y1719 •F <br />Of <br />22. Therrnol•Sensor reading atter circulation <br />Add20" for 4" L ................. — " <br />digit$ <br />Nearest <br />Add 24" for 2" L er air seal ....... " <br />23. Digits per IF In rangy of expected change 3 z 4, <br />Total tubing to assemble Approximate . <br />agd$ <br />6®�-S 5 7/ffl <br />Z. �i0�'`f <br />20. EXTENSION HOSE SETTING [` <br />1 <br />24. X 1000 <br />total quantity In coeMkNnt of expansion for <br />volume change in this tank <br />IF <br />gallons <br />Tack top to gni•.................................. <br />full tank (16 or tip Involved product <br />pier <br />Exthos on suction Wit 6'.. more <br />3 <br />25. <br />I ®l ® 6 7 S SJO JC1,61b.�, <br />below tank top . ............. _ <br />+ <br />.�0� .S.......................volume <br />a <br />change per •F (24) 0108 per 'F in test <br />Volume change per digit. <br />'If Fill pipe extends above grant, use top of fill. <br />Range (23) <br />Compute to 4 decimal places. <br />OBSERVED GRAVITY X5.5 <br />OBSERVED TEMPERATURES 73 0 <br />CORRECTED API GRAVITY <br />C. 0. E. 1000 5 718 <br />
The URL can be used to link to this page
Your browser does not support the video tag.