Laserfiche WebLink
UST SYSTEM PRINTSET INFORMATION 9 10 <br />1. Four complete sets of plans (To include specification sheets and/or equipment brochures if not on file). <br />2. Plans drawn to scale in non -erasable print. <br />3. Plot plan to show location and number of tanks. <br />4. Tank cross-sectional diagram included on prints submitted. <br />5. Detail of tank, piping system, excavation and cover. <br />6. Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Subchapter 16, <br />Article 3, Sec. 2631 (r) & 26351 <br />7. Verification of product compatibility with the tank(s), piping, monitoring <br />device(s), epoxy or silicone glues, etc. (Section 2635 (b) (2)] <br />8. Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. (Section 2635 (b) (5)l <br />9. Tightness Test (NFPA 30) is required on both primary (10) and secondary (20) containment systems before covering. <br />[Section 2635 (b) (6) & (7)] <br />10. Double walled tanks using pressure or vacuum testing to monitor the annular space. ESection 2635 (b) (7)] <br />11. NFPA 329 "Precision Tests, required upon completion of installation with tank in operating condition. Test results to <br />be submitted directly to PHS/EHD from the testing company or owner of facility. [Health & Safety Code, Division 20, <br />Chapter 6.7, Section 25291 (g)] <br />IG. LMR 64,AV'Wi 6 iuw <br />TANK # <br /># <br /># <br /># <br />___-- <br /># # <br />CAPACITY (Gallons),_ <br />000 <br />000 <br />1 000 <br />1 000 <br />MANUFACTURER <br />COMPOSITIONMODEL <br />s <br />erxes <br />i er- <br />Xerxes <br />F'ber-F <br />Xerxes <br />er- <br />Ebber- <br />PRODUCT aseoilne)nl <br />e Unl <br />Su er UnI <br />Mid-gradE Unl <br />CORROSION PROTECTION <br />/A <br />/A <br />NIA <br />N/A <br />U.L. LISTED <br />fES <br />fES <br />YES <br />YES <br />COMPATIBILITY WITH 100% <br />METHANOL <br />�ES. <br />ES <br />YES <br />YE S <br />13. TANK(s) TO BE INSTALLED <br />_ A. Steel -clad with fiberglass reinforced plastic. <br />e. Holiday test required immediately before "setting" tank(s) (35,000 - 40,000 volts). (Section 2635 (b) (4)l <br />C. Fiberglass [Sections 2635 (3) and 2631 (07 <br />(1) Striker plate dimensions and materials. <br />(2) Striker plate under all accessible openings. <br />(3) installation instruction require an air test and soap bubble test prior to installation. <br />p. Hon -clad steel tank ESection 2635 Ml <br />(1) Cathodic protection provided for entire tank, piping and components (ruts, bolts, washers, <br />etc.). <br />(2) Approved by a corrosion engineer or N.A.C.E. technician. <br />(3) •Document stating inspection method and frequency (minimus semi-annual inspection requirement). <br />4 <br />