My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
2300 - Underground Storage Tank Program
>
PR0231127
>
COMPLIANCE INFO_1986-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 12:21:10 PM
Creation date
6/23/2020 6:44:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1996
RECORD_ID
PR0231127
PE
2361
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
01
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231127_1612 W HAMMER_1986-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
529
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7Ailr <br />TAIT & ASSOCIATES, INC. <br />Consulting Engineers <br />March 23, 1995 <br />FedEx <br />UST Permit Manager <br />San Joaquin Co. PHS EHD <br />445 N. San Joaquin Street <br />Stockton, CA 95201 <br />RE: ARCO Facility 548 <br />1612 Hammer Lane, Stockton, CA. <br />Tait Job AR -655 <br />Dear UST Specialist <br />`r, tP Civil • Planning • Surveying • Environmental <br />'s �Z <br />On behalf of ARCO Products Co., Tait & Associates is pleased to <br />submit the following for UST Removal and UST Installation Permits. <br />A check in the amount of $2,230.00 (See fee worksheet). <br />UST Removal: <br />1. 3 sets of plans <br />2. UST Removal Application (in triplicate) <br />UST Installation: <br />1. 3 sets of plans & equipment cut sheets <br />2. UST Installation Application (in triplicate) <br />3. S.W.R.C.B. Form A & B - (4 tanks) <br />The focus of this project is to replace the 4 existing UST's and <br />piping with 4 new D.W. fiberglass tanks and piping. Note that <br />contractor information will be forwarded to your office as soon as <br />one is selected. <br />Should any questions arise during your review of this project, <br />don't hesitate to contact me at this office. Thank you for your <br />assistance. <br />Resp ;Schoenstein <br />ly <br />TAI 'OCIATES <br />A <br />omas <br />Project Architect <br />enc: as noted <br />cc: Ken Lanz, ARCO Products Co., (w/enc.) <br />Jim Martin, ARCO Products Co., (w/enc.) <br />Kyle Christie, ARCO Products C., (w/enc.) <br />1001 Galaxy Way / Suite 404 / Concord, CA 94520 / (510) 680-6800 / (510) 680-7878 FAX <br />
The URL can be used to link to this page
Your browser does not support the video tag.