Laserfiche WebLink
0 0 <br /> San Joaquin DIRECTOR <br /> PQ U 7 N Donna Heran,REHS <br /> ,O C®GEnvironmental Health Department ASSISTANT DIRECTOR <br /> 600 East Main Street Laurie Cotulla,REHS <br /> Stockton, California 95202-3029 PROGRAM COORDINATORS <br /> •'' • Carl Borgman, REHS <br /> �:•, P Mike Huggins,REHS, RDI <br /> iF®R"e` este: sjv.org/e Margaret Lagorio,REHS <br /> Phone: (209)468-3420 Robert McClellon, REHS <br /> Fax: ( )464-0138 Jeff Carruesco, REHS, RDI <br /> Kasey Foley,REHS <br /> March 19,2009 <br /> Maqsood Ali <br /> Technical Studies <br /> 2696 Screech Owl Way <br /> Sacramento, CA 95834 <br /> Fax: (866) 705-4778 <br /> Parkwood Gas, 1612 W Hammer Lane,Stockton,CA 95209(S0056184) <br /> The San Joaquin County Environmental Health Department(EHD)has completed the review of the application <br /> for a permit to remove the two north dispensers,under dispenser containment(UDCs)and piping and install <br /> new piping and UDCs. The two dispensers will be moved to the east side of the store. Vent piping will be <br /> installed on the southeast side of the property. A Healy tank and Incon ISD will be installed for the EVR phase <br /> II upgrade. The permit has been approved with the following conditions: <br /> 1. Contact the City of Stockton(COS)Bureau of Fire Prevention,the San Joaquin Valley Air Pollution Control <br /> District, and COS Community Development for applicable permits. <br /> 2. If the alarm history is cleared by a cold start of the monitoring panel,an alarm history printout must be <br /> created before the cold start and available for EHD inspection. <br /> 3. Contact Garrett Backus,REHS at(209)468-2986 for the following inspections. All appointments must be <br /> scheduled 48 hours in advance. <br /> • Sampling of the soil beneath the piping and UDCs to be removed. <br /> • Piping slope inspection. <br /> • Primary and secondary piping soap test before backfilling the excavation. <br /> • Primary and secondary piping tightness test following manufacturer's instructions. <br /> • UDC hydrostatic test following manufacturer's instructions. <br /> • Tank secondary containment test following manufacturer's instructions. <br /> • Functionality test of the liquid sensors installed in the UDCs. <br /> • If the monitoring panel is cold started and the alarm history is erased,every liquid sensor <br /> must be tested. <br /> 4. Qualified installers must possess or work under the direct and personal supervision of an individual <br /> physically present at the work site, at all times while work is being performed, who possesses all of the <br /> following: <br /> • One of several permissible valid,current contractor's licenses issued by the Contractors State <br /> License Board(may be issued to the installation company), and <br /> • A valid,current UST Installation/Retrofitting certificate issued by the International Code <br /> Council(ICC), and <br /> • A valid, current certificate of training from the manufacturer(s)of the component(s)being <br /> tested,repaired,or serviced. <br /> Additionally, <br /> Page 1 of 2 <br />