My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
2300 - Underground Storage Tank Program
>
PR0231127
>
COMPLIANCE INFO_2002-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 1:48:44 PM
Creation date
6/23/2020 6:44:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2009
RECORD_ID
PR0231127
PE
2361
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
01
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231127_1612 W HAMMER_2002-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GarKeft Backus [EH] <br />From: Garrett Backus [EH] <br />Sent: Monday, March O9.2O0B4:20PM <br />To: 'yNeq000d' <br />Subject: RE: Hammer Lane Phase 11113 - Valero Gas Station <br />Attachments: 1G12Hammer Lane.pdf <br />Here are my comments on the 1612 Hammer Lane permit application: <br />Removal of piping and UDCs: <br />Page I of 6 <br />1. page 2,section 5z The statement "Blow lines free of liquid with Nitrogen" should be written on section 6a. <br />since itiomethod b)purge the piping. <br />Purging with nitrogen isnot adecontamination method. Decontamination can bedone bytriple rinsing the pipe <br />and collecting the rinsote. Describe how the rinmetewill bmcollected and stored onsite. Triple rinsed piping ionot <br />considered hazardous waste. The rinuatemust behauled eohazardous waste. Another option iahauling the <br />pipe oohazardous waste and not rinsing. <br />2. The hauler listed "Jim Thorpe Oil Inc." is not a registered hazardous waste (HW) hauler. |naddition, the listed <br />disposal site at "580 Truck St, Placerville" is not a permitted TSDF or Treatment,&Disposal Facility. <br />3. A registered hazardous waste hauler and TSDF must be provided in the permit application since rinsate or <br />piping will behauled from the site ashazardous waste. Also provide the site EPA |[} number needed for the <br />hazardous waste manifest (to beincluded insection 6n). <br />4. Page 5needs the laboratory name after "Hereby authorize" <br />Installation of sumps and piping: <br />5. | need cut sheets for the Bravo vent box, Unisource flex connectors and the OPVVshear valves. <br />G. | need manufacturer training certificates for the Bravo sumps, Unisource flex connectors, DpVVshear valves. <br />Note that one technician working at the site must have ICC Installer training and manufacturer training onall <br />components (VmederRoot, OPVVshear valves, Unisource flex connectors, Bravo sumps, Smith Red Thread). If <br />technician is the only one onsite with Bravo training he must have the ICC cert aawell. <br />Ifyou would like toget the removal part ofthe permit done quickly and leave the install part for later then fill out <br />the UST Closure permit application and submit fees for that part. <br />Garrett Backus, REHS <br />San Joaquin County Environmental Health Department <br />600 E. Main Street <br />Stockton, CAB52O2 <br />telephone: (3O9)4G8'2S80 <br />fax: (2D9)468-3433 <br />email: gbackus@51pehd.com <br />3/l0/20O9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.