Laserfiche WebLink
-----Original Message ----- <br />From: Garrett Backus [EH] [mailto:gbackus@sjcedcom] <br />Sent: Tuesday, March 03, 2009 12:42 PM <br />To: Gary Cathcart; Maqsood; Ken Doty <br />Cc: Eric Elias; Gary Grinstead; James Campero; Phil Simon; Jasbir <br />Cheema; Kasey Foley [EH]; Willy Ng [EH] <br />Subject: RE: Hammer Lane Phase IIIB - Valero Gas Station <br />FYI, <br />This facility does not have an approved permit to change the underground <br />tank system from the Environmental Health Dept. The permit has been <br />applied for but has not been approved pending more information from the <br />contractor. Removal and installation of the under dispenser containment <br />and associated piping REQUIRE an approved permit. <br />Garrett Backus, REHS <br />San Joaquin County Environmental Health Department 600 E. Main Street <br />Stockton, CA 95202 <br />telephone: (209) 468-2986 <br />Fax: (209) 468-3433 <br />email: gbackus@sjceh—.co n <br />-----Original Message ----- <br />From: Gary Cathcart [mailto:Gary._Cathcart aaci.stockton ca.us] <br />Sent: Tuesday, March 03, 2009 10:10 AM <br />To: Maqsood; Ken Doty <br />Cc: Eric Elias; Gary Grinstead; James Campero; Phil Simon; Garrett <br />Backus [EH]; Jasbir Cheema <br />Subject: Re: Hammer Lane Phase IIIB - Valero Gas Station <br />The City of Stockton is prepared to issue a partial permit for the partial <br />demolition of the existing canopy and the removal of the two pumps and the <br />associated pump island only at this time. Any other work including the <br />construction of the new canopy and the trash enclosure are still subject to <br />Plan Check and approval before any permits can be issued. Our preference <br />is not to issue multiple partial permits but to issue one permit for all of the <br />remaining work. <br />gd Cathcart, Senior Plan Checker <br />City of Stockton <br />Community Development Dept <br />Building Div <br />209-937-8353 <br />gary.cathcart a@ci stockton.ca us <br />3/10/2009 <br />Page 4 of 6 <br />