My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
2300 - Underground Storage Tank Program
>
PR0231127
>
COMPLIANCE INFO_2002-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 1:48:44 PM
Creation date
6/23/2020 6:44:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2009
RECORD_ID
PR0231127
PE
2361
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
01
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231127_1612 W HAMMER_2002-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"Built -to -Code = the worst construction allowed by law" <br />>>> Maqsood <mali de signsbuild.com> 3/3/2009 7:49 AM >>> <br />Hi Ken, <br />On February 25, 2009, we received 3rd check comments from City of <br />Stockton, which we have responded yesterday (March 2, 2009) to get partial <br />permit for the removal of canopy, relocation of two dispensers, installation <br />of new canopy and trash enclosure (to install EVR tank inside trash encl.) <br />for dispensers which will be relocated on east of convenience store. <br />Yesterday, I met with City official Mr. Gary Cathcar and Gary Grinstead to <br />explain our response on their comments and to request to expedite the <br />permit. I hope in this week we will get partial permit. <br />We already have bid ready to award this contract to a general contractor. <br />Yesterday, I had meeting with owner about the progress of this work. I hope <br />at the end of this week we will get partial permit and next week we will <br />award this contract to a general contractor. <br />Contractor will mobilize on March 16, 2009. I will keep in touch with you <br />about the progress of work. <br />Maqsood Ali <br />Ph: (916) 419-1900 <br />--- On Tue, 3/3/09, Ken Doty <kdoty_@a markthoas _com> wrote: <br />From: Ken Doty <kdoty@a markthomas com> <br />Subject: Hammer Lane Phase IIIB - Valero Gas Station <br />To: "Maqsood" <mali@designsbuildco_m> <br />Cc: "James Campero" <James.Campeso@cistoctoncaus> <br />Date: Tuesday, March 3, 2009, 3:26 AM <br />Hi Maqsood <br />From what I hear it sounds like things are moving along for you with the <br />Valero gas station. With it being March already I wanted to touch bases <br />with you one more time. PG&E still seems to be on schedule with their <br />beginning of construction scheduled for March 14th. I understand that you <br />are obtaining a partial permit for the removal of the canopy and pump <br />island. I ❑ m not sure if you will be able to meet a March 14th date to <br />remove the canopy and pump island. If I could get a construction schedule <br />from you for when you plan on getting bids from Contractors, begin work, <br />removal of the canopy and island and when work will be finished, I would <br />appreciate it. I am asking PG&E for a construction schedule as well so they <br />can be compared. The work may overlap but hopefully not to a point where <br />it is stopped. It could be close but that is what I want to check. <br />Thanks. <br />Kenneth E. Doty <br />Project Manager - Sacramento <br />3/10/2009 <br />Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.