My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
2300 - Underground Storage Tank Program
>
PR0231127
>
COMPLIANCE INFO_2002-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 1:48:44 PM
Creation date
6/23/2020 6:44:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2009
RECORD_ID
PR0231127
PE
2361
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
01
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231127_1612 W HAMMER_2002-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRIMARY AND VAPOR PIPING <br />A.7 - Please refer to your pipe manufacturer's Installation Instructions to install primary and/or <br />vapor pipe at this time. Pay special attention to the FITTING MANUFACTURERS INSTALLATION <br />INSTRUCTIONS! Save yourself time by following them closely. <br />1 1 1 1111:ilii� 11�1 <br />It is recommended that all piping and conduits be <br />r - <br />connected at this tinie. Cl'iiiii- 61o' dwtj# 0'%3- %^X MCILUU 100i.1, to L4ij <br />fha rfi4mancar ctimn AnH RnAf racarwnir [if lintor _-wtrr�p <br />is equiped with the float -trip system) All field installed <br />penetration fittings must be water -leak tested <br />13.1 -To test <br />comnlptplv siinnortpd, no not allow island siinnorts to hold all the weight. The box will become <br />extr�mely'hea�v`y. <br />E;.&- rill Elitl- IJUA W11.11 wdl.t�l lu e. 1111WIV5 dUUV(- LIM 111911(--bl. 111.1.1119. MILVI'43 iiuuirs, rnake a visual <br />,9-ppropriate pump. DO NOT DRILL A DRAIN HOLE, and plan to patch the hole. <br />ff CC' 10 Ali <br />B: Repair or reinstall penetration fittings according to your penetration fitting manufacturers' <br />Installation I Maintenance Instructions. <br />C: Occasionally... Bravo Fiberglass Series Products may suffer mild damage in transit or field installation. <br />Please take a close lock nt <br />D: FUk FiESERGLASS REPAIRS: Abrade a 2" diameter area centered on the leak point until flow coat <br />i$ gone a A i- <br />----4 -4 40, <br />not use shop towels or acetone. S. Bravo Systems recommends "Smith Fibercast Adhesive Kit #8014" <br />to <br />Lll;Z;vo rIbergiass products. Make sure area is curnpieieiy dry and apply resin <br />genprously. For anything lamer than ninholp 1pqk-, voi i mist ron.qi ilt the fsrtory, <br />r.--.— 77_7 1VL1(nLJV11 1ILLIf iuicit.Auiq:�ib iepair <br />recommendations in their respective Installation Instructions. DO NOT compromise Bravo Product Integrity- <br />_:_ <br />711, hcit. <br />4 ii -4K -8k -9k -SW -07A <br />
The URL can be used to link to this page
Your browser does not support the video tag.