My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
2300 - Underground Storage Tank Program
>
PR0231127
>
COMPLIANCE INFO_2002-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 1:48:44 PM
Creation date
6/23/2020 6:44:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2009
RECORD_ID
PR0231127
PE
2361
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
01
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231127_1612 W HAMMER_2002-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br />Conditions for N-4067-1-4 (continued) Page 3 of 4 <br />14. Periodic maintenance inspections of the Phase I vapor recovery system shall include, at a minimum, verification that 1) <br />the fill caps and vapor caps are not missing, damaged, or loose; 2) the fill'cap gasket and vapor cap gaskets are not <br />missing or damaged; 3) the fill adapter and vapor adapter are securely attached to the risers; 4) where applicable, the <br />spring-loaded submerged fill tube seals properly against the coaxial tubing; 5) the dry break (poppet -valve) is not <br />missing or damaged; and 6) the submerged fill tube is not missing or damaged. [District Rule 4621] <br />15. Periodic maintenance inspections of the Phase 11 vapor recovery system shall include, at a minimum, verification that <br />1) the fueling instructions required by this permit are clearly displayed with the appropriate toll-free complaint phone <br />number and toxic warning signs; 2) the following nozzle components are in place and in good condition as specified in <br />ARB Executive Order as applicable: faceplate/facecone, bellows, latching device spring, vapor check valve, spout <br />(proper diameter/vapor collection holes), insertion interlock mechanism, automatic shut-off mechanism, and hold open <br />latch (unless prohibited by law or the local fire control authority); 3) the hoses are not torn, flattened or crimped; 4) the <br />vapor path of the coaxial hoses associated with bellows equipped nozzles does not contain more than 100 in I of liquid <br />if applicable; and 5) the vapor processing unit is functioning properly, for operations that are required to have or <br />possess such a unit. [District Rule 4622] <br />16. In the,evept of a separation Oue, to 4 drive, off, the permittee, shall, unless otherwise specified in the applicable ARB <br />Executive Order, conduct a visualinspection of the affected equipment and either I) perform qualified repairs on any <br />damaged components and conduct applicable re -verification tests pursuant to the requirements of this permit, or 2) <br />replace the affected nozzles, coaxial hoses, breakaway couplings, and any other damaged components with new or <br />certified rebuilt components that are ARB certified. The activities shall be documented in accordance with the <br />requirements of this permit before placing the affected equipment back in service, [District Rule 4622] <br />17. The gasoline throughput for this permit unit shall not exceed 5,256,000 gallons in any one calendar year. [District Rule <br />2201] <br />18. The permittee shall conduct all periodic vapor recovery system performance tests specified in this pert -nit, no more than <br />30 days before or after the required compliance testing date, unless otherwise required under the applicable ARB <br />Executive Order. [District Rules 4621 and 4622] <br />19, The permittee shall perform and pass a Static Torque of Rotatable Phase I Adaptors test using ARB procedure TP- <br />201.113 <br />P - <br />201.1B within 60 days after initial start-up and at least once every 36 months thereafter, [District Rule 4621 ] <br />20. The permittee shall perform and pass a Pressure Integrity of Drop Tube Drain Valve Assembly Test using ARB TP - <br />201. IC or a Pressure Integrity of Drop Tube Overfill Protection Devices Test using ARB TP -201.1D if an overfill <br />protection device is installed, within 60 days after initial start-up and at least once every 36 months thereafter. [District <br />Rule 4621 ] <br />21. The permittee shall perform and pass a Static Leak 'rest for Underground Tanks using ARB TP -201.3 in accordance <br />with the Executive Order specified in this permit for the Phase 11 Vapor Recovery System within 60 days after initial <br />start-up and at least once every 12 months thereafter. [District Rules 4621 and 4622] <br />22. The permittee, shall perform and pass a Dynamic Back Pressure Test using ARB TP -201.4 within 60 days after initial <br />start-up and at least once every 12 months thereafter. [District Rule 4622] <br />23. The permittee shall perform and pass a Vapor -to -Liquid Volume Ratio Test using the test procedure defined in the <br />Executive Order specified in this permit for the Phase If Vapor Recovery System within 60 days after initial startup <br />and at least once every six (6) months thereafter. [District Rule 4622] <br />24, The permittee shall perforin and pass a Static Pressure Test for the Healy Clean Air Separator using the test procedure <br />defined in the Executive Order specified in this permit for the Phase It Vapor Recovery System within 60 days after <br />initial startup and at least once every 12 months thereafter. [District Rule 4622] <br />25. The permittee shall perform and pass a Nozzle Bag Test using the test procedure defined in the Executive Order <br />specified in this permit for the Phase 11 Vapor Recovery System within 60 days after initial startup, [District Rule <br />4622] <br />26. The permittee shall perform and pass a Dispenser vapor Line Tightness test for each dispenser using the test procedure <br />defined in the Installation, Operation and Maintenance manual of the Executive Order specified in this permit for the <br />Phase II Vapor Recovery System within 60 days after initial startup and at least once every 12 months thereafter. <br />[District Rule 4622] <br />N4067•t 4, Mar 0 2009 8 WAM -.WN <br />
The URL can be used to link to this page
Your browser does not support the video tag.