Laserfiche WebLink
SW.RCB, January 2002 <br />9.&JOVERFILL CONT.AMWENT BO S <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested 4 <br />st Method Developed By: ❑ Spill Bucket Manufacturer. 0 Industry Standard <br />❑ Other (Specify) <br />Test Methoii-Used: ❑ Pressure ❑ Vacuum <br />❑ Other (Sped) <br />Test Equipment Used: 77--.1-- <br />Page '7 of <br />❑ Professional Engineer <br />❑ Hvdrostatic--- <br />� <br />�� <br />Bo$ # <br />Spill <br />or failed tests) <br />, .M, , .•p u,z „ <br />p11 <br />Box # <br />Spill Box # <br />Spill Boz # <br />Bucket Diameter: <br />Bucket Depth: <br />Wait time between applying <br />,. <br />pressure/vacuum/water and <br />startin test:^ <br />Test Start Time: <br />Initial Reading (Ril: <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in ming (RF-Ro: <br />Pass/Faiklbreshold or <br />Criteria: <br />Test Result: <br />❑ Pass -` ❑ Fail <br />❑ Pass 0 Fail <br />❑ Pass 0 Fail <br />0 Pass 0 Fail ' <br />Comm <br />S It 1 <br />nts — (i <br />D <br />dude in ormation on repairs made prior to testing, and recommended ollow-u <br />or failed tests) <br />