Laserfiche WebLink
D. Re.9 idta o.i<"Testin Sery elhA q <br />Software Version installed: 16.0 <br />r aninlete the followinLy checklist: <br />a Yes <br />❑ No* <br />Is the audible alarm operational? <br />Yes <br />❑ No* <br />Is the visual alarm operational? <br />Yes <br />❑ No* <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />2L Yes <br />❑ No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br />not interfere with their proper operation? <br />❑ Yes <br />❑ No* <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br />& N/A <br />operational? <br />Yes <br />❑ No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br />N/A <br />monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br />positive shut -down? (Check all that apply) 6Sump/Treneh Sensors; e'4i1t Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? 1d Yes; ❑ No. <br />es ❑ No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br />�" �N/A <br />mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br />GLLE Ip 4C <br />fillpoint(s) and o eratin roperl ? If so, at what percent of tank capacity does the alarm trigger? % <br />❑ Yes* f No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced <br />and list the manufacturer name and model for all re lacement arts in Section E, below. <br />❑ Yes* A No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) ❑ <br />Product; ❑ Water. If yes, describe causes in Section E, below. <br />Yes i Q No* <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />Yes Q No* <br />Is all moT!!2!:tg equipment o erational er manufacturer's specifications? <br />^- in aectu i r, oeiow, aescriue now and when these deficiencies were or will be corrected. <br />E. Com- -ients: <br />Page 2 of 3 03/01 <br />