Laserfiche WebLink
1pA. Monitoring Plan -. Page 1 Instructio <br />Complete a separate UST Monitoring Plan for each UST monitoring system at the facility. This form must be submitted with your initial UST <br />Operating Permit Application and within 30 damson changest the equipment (ote:oNumbering of these instructions fcontains. please note that ollows the data element local agency may numbers on <br />uire you to <br />obtain approval prior to installingor modifying g q P � <br />the form.) <br />MOI. <br />M02. <br />M03. <br />M04. <br />MOS. <br />M06. <br />M0T <br />MIO <br />TYPE OF ACTION - Check the appropriate box to indicate why this plan is being submitted - <br />PLAN TYPE -Check the appropriate box h indicate whether� Plante thers all, <br />ID #(s) in item 432 of the or merely some, of the USTs UST Operating Pthe facility. If ermit Application Y <br />some of the tanks, identify those tanks in the space pro g•> by B <br />Tank Form(s)]. <br />FACILITY ID NUMBER -This space is for agency use only. <br />FACILITY NAME - Enter the complete Facility Name. <br />FACILITY SITE ADDRESS - Enter the street address where the facility is located, iincluding bbuilding number, if applicable. Post office box numbers <br />are not acceptable. This information must provide a means to locate the facility geographically. <br />CITY - Enter the city or unincorporated area in which the facility is located. the frequency of monitoring equipment testing/certification. <br />ED - Checked the appropriate box to specify- <br />MONITORING EQUIPMENT IS SERVIC <br />SPECIFY - If item II -99 is checked, enter the frequency of monitoring equipment testing/certification.TANK MONITORING METHOD(S) - Check the appropriate box(es) in Section IV to identify all required methods used for monitoring UST(s) <br />covered by this plan. o ate box to describe the environment inside tank secondary containment. <br />SECONDARY CONTAINMENT IS - Check the appropriate <br />ppy pri stem control panel console <br />PANEL MANUFACTURER - If item IV -1 is checked enter the name of the manufacturer oCO tifothpanmonit°ring system P (console). <br />MODEL # -If item IV -1 s checked, enter the model number for the monitoring system <br />ENSOR MANUFACTURER - If item IV -1 s checked, enter the name of the manufacturer of the sensor(s). If additional space s needed use <br />Mil. <br />M12. <br />M13. <br />M14. <br />MI5. <br />M16. <br />MIT <br />M18. <br />M19. <br />M20. <br />M21. <br />M22. <br />M23. <br />M24. <br />LEAK S <br />Section IX. of sensor installed. If additional space s needed, use Section IX. <br />MODEL #(S) - If item IV -1 s checked, enter the model number• for each type stem control panel (console). <br />PANEL MANUFACTURER - If item IV -2 is checked, enter the name of the manufacturereP° tong s' <br />MODEL # - If item IV -2 s checked, enter the model number for the monitoring system <br />of m -tank probe installed. If additional space is needed, use Section IX. <br />IN -TANK PROBE MANUFACTURER - If item IV -2 is checked, enter the name of the manufacturer of the pro s . <br />MODEL #(S) - If item IV -2 s checked, enter the model number for each iate type ox to describe the- leak test frequency. <br />Pn <br />LEAK TEST FREQUENCY - If item IV -2 s checked,cheo the aPPr leak tests. <br />SPECIFY - If item M20 a is checked,enter the frequency programmed box to describe the tests Programmed into the ATG system. <br />ate <br />PROGRAMMED TESTS - If item IV -2 s checked, check the appropn <br />d, enter the frequency of in -tank leak testing. box <br />INVENTORY RECONCILIATION - to describe the ripe of inventory reconciliation perforated <br />SPECIFY - If item M22 -c s checkeIf item IV -3 is checked check the appropriate <br />(i.e., Manual or Statistical). ate box to describe the MTG testing period. <br />TESTING PERIOD - If item IV -4 is checked check the appropriate ofd integrity testing. <br />TEST FREQUENCY - If item IV -5 is checked, check �the Oftankgrity testing. opriate box to describe the frequency <br />SPECIFY - If item IV -S -c s checked, enter the frequency used (e. vadose zone monitoring per 23 CCR <br />per 23 CCR §2648d Include the monitoring frequency (e.g., Continuous, Weekly). If additional space is needed, use <br />SPECIFY - If item IV -99 s checked, enter a brief description of the other tank monitoring methods g•� <br />§2647, groundwater monitoring p in the <br />IX In Section V to identify all required methods used for monitoring Piping <br />M25. <br />M26. <br />M27. <br />M28. <br />Section Check the appropriate boxes) <br />M30. PIPE MONITORING METHODS) - <br />UST system(s) covered by this plan <br />IS -Check the appropriate box to describe the environment inside piping secod control ry panel(console). <br />ent <br />M31. SECONDARY CONTAINMENTIf item V-1 is checked, enter the name of the manufacturer of the monitoring system <br />M32. PANEL MANUFACTURER -r for the control panel. <br />M33- MODEL # - If item V-1 F checked, enter �� del V-1 s cheeccked, enter the name off the manufacturer of the sensor(s). <br />M34. LEAK SENSOR MANUFACTURE enter the model number for each type of sensor installed. If additional space s needed, use Section IX. <br />M35. MODEL #(S) - If item V-1 is checked, check Yes or No. <br />M35. WILL PIPING LEAK ALARM TRIGGER PUMP SHUTDOWN? - If item E S SHUTDOWN? - If item V-1 is checked, check Yes or No. <br />M37. WILL FAIL URE/DISCONNECTION OF MONITORING SYSTEM TRIGGER SHUTDO <br />M3g WILL <br />Lp MANUFACTURER(S) - If item V-2 is checked, enter the name(s) of the manufacturers) of the mechanical line leak detector(s). If additional <br />cal line leak detector installed If additional space is needed <br />space is needed, use Section IX. enter the model number for each type of mechani <br />M39. MODEL #(s) - If item V-2 s checked, <br />use Section IX. <br />checked, enter the model number for each type of electronic line leak detector installed. If additional space is needed, use <br />M40. ELLD MANUFACTURER � chtem V-3 s checked, enter the name of the manufacturer of the electronic line leak detector(s)- <br />use <br />etecto s . <br />M41. MODEL #(S) - If item V of tests programmed into the <br />Section IX. INTEGRITY TESTS - If item V-3 is checked, check the appropriate box to describe the type P <br />M42. PROGRAMMED LINE INTE <br />monitoring system. TRIGGER PUMP SHUTDOWN? - If item V-3 is checked, check Yes or No. <br />ISCONNECTION TRIGGER PUMP SHUTDOWN? - If item V-1 s checked, check Yes or No. <br />M43. WILL ELLD DETECTION OF PIPING LEAK ALARM ro nate box to describe the frequency of pipe integrity testing. <br />M44. WILL ELLD FAILURE/D <br />M45. TEST FREQUENCY - If item V 4 s checked, check the app i p integrity testing en of usual monitoring. <br />M46. SPECIFY - If item V -4-c is checked enter the frequency pipe box to describe the ) use frequency <br />methods) used. If additional space is needed, use Section <br />M47 VISUAL MONITORING DONE -If item V-5 -- checked check the appropriate <br />M48. SPECIF - If item V_99 is checked, enter a to clearly describe monitoring metrief sand frequenccription of y. °�� tine monitoring <br />1X Be s performed (i,e., location of <br />Plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is p i <br />This monitoring p stem control panel, etc.). If you already have a diagram (e.g., current UST Monitoring Site Plan from a <br />each sensor, line leak detector, monitoring system <br />an map, etc.) which shows all required information, include it with this Plan. <br />Monitoring System Certification form, Hazardous Materials Business PI <br />07/23/03 <br />SJCEIID-d (07/03) - 2/4 <br />