My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
2300 - Underground Storage Tank Program
>
PR0231127
>
COMPLIANCE INFO_2002-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 1:48:44 PM
Creation date
6/23/2020 6:44:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2009
RECORD_ID
PR0231127
PE
2361
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
01
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231127_1612 W HAMMER_2002-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f � d <br />SWRCB, January 2002 <br />Page -�> of <br />Test Method Developed By: <br />,ping Manufacturer U Industry Standard U Professional Eagincer <br />Other (Specify) <br />Test Method Used: <br />'Pressure <br />U other ( ciify) <br />U Vacuum. <br />U Hydrostatic <br />Test F.guipmeitt Used: re S 5 w✓'e_ <br />Piping Run # <br />Piping Material: �s lv (, tr y4 <br />Piping Ran # <br />n 1 <br />Equipment Resolution: '//V s <br />Piping Run #> Piping Run # <br />Piping Mamifacturer. <br />5w, c A, <br />w r E, <br />1 T <br />Piping Diameter: <br />311 <br />3 c <br />f it <br />Length, of Piping Run:. <br />AO Oya t''t 01 <br />Y v t <br />-A, h x-4.5 t <br />Produci Stored: <br />&L <br />Method and location of <br />piping -run isolation: <br />-O i -•b®,Of qi'-,STP 41 <br />at D —4:'r4- a <br />9.t iA t i <br />L c/? c f Z - <br />Wait ' between applying. <br />acuunVwater and <br />staitin test <br />�- <br />Test Start Time: <br />9 t. v <br />�' �, ej <br />V 0 <br />Initial Reading (N: <br />S V-s <br />S S S <br />P" Z <br />Test End Time: <br />Final Reading (Rg): <br />5 P!5 --+w <br />5' PS= <br />P5:17 <br />Test Duration: <br />Change in Reading (Rr-R�. <br />5 <br />VS r <br />PS s <br />Pass/Fail Threshold or <br />Criteria: N o L o s s „r, V').r !-a; S w- 9� S v G.®ss v� Y) S <br />Comments — Cmdu& hn ormadon.on matte prior to. testm and Lmra oilou- ar ailed tesxr <br />D G 4 � 2__ k -R S —f"' TSG s.r� 5 t.� > 2 cGr� ciatiy �l f� f 12Q i -C ar a f- <br />j4e-X ,(d�LA Ql <br />
The URL can be used to link to this page
Your browser does not support the video tag.