My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
2300 - Underground Storage Tank Program
>
PR0231127
>
COMPLIANCE INFO_2002-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 1:48:44 PM
Creation date
6/23/2020 6:44:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2009
RECORD_ID
PR0231127
PE
2361
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
01
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231127_1612 W HAMMER_2002-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWP,CB, January 2002 <br />Page 5 of <br />7. UNDER -DISPENSER CONTAINMENT UDC TESTING <br />Test Method Developed By: U UDC Manufacturer U Industry Standard. ofessional Engineer <br />U Other (Spec) zr_ <br />Test Method Used: U Pressure U Vacuum )�yd_rostatic <br />U Other (Specify) <br />l Js e-,, <br />Used: �k du/e/1 !�-v�CUDC <br />Equipment Resolution: / <br />"EcqMdt <br /># l L. UDC # 3 g <br />UDC #S £ - UDC# -7 18' <br />turer: v v <br />"� va v <br />ra u n <br />Ger a <br />UDC <br />Height from UDC Bottom to Top <br />of H" est PipjR& Penetration ks <br />_ <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: 60M*L-� <br />Condition of UDC prior to <br />testi : �'( <br />��°� <br />�L <br />Y� <br />Portion of UDC Tested W q d-cy /_ewe <br />Does turbine shut down when U Yes U No A <br />UDC detects liquid <br />sensor (both <br />U Yes U No <br />U Yes U No <br />U Yes U No ),d A <br />product and water)?* <br />Turbine shutdown resp2nse time (VIA- <br />� A - <br />Is system programmed for fail- U Yes U No A <br />safe shutdown?* <br />U Yes U No � <br />LNA U Yes U No &A <br />U Yes U No A <br />Was tail -safe verified to be U Yes U No )KNA <br />o Mdonal?" <br />U Yes U No AA <br />U Yes U No YTA <br />U Yes U No kMA <br />Wait time betwee <br />pressure/vacuum/ d <br />starting test 10 <br />LU <br />l d we <br />a awn <br />Test Start Time: 5! a <br />Initial Reading i : r t L/- <br />Test End Time: 0: v <br />35ef., <br />evv <br />i_ q.5 <br />Final Readin F- 4- of <br />aGors t c-C�+ <br />, <br />Test Duration: 3 o - <br />3 <br />3 <br />3D s <br />Chan a in Readin -RI); b s.. <br />n v C.L <br />W re c <br />w u <br />Pass/Fail Threshold or Criteria: l Gw�ud,t �.� g N.LGr✓r <br />ic,., p w.;, <br />t <br />Wap sensor removed for testing? V yes U No U NA <br />es U No U NAU <br />No U NA <br />U No U NA <br />Was sensor properly replaced and KVes U No U NA <br />fimetional <br />)(I'es U No U NA <br />Ayes U No U NA <br />Yes <br />verified after testing? <br />U No U NA. <br />Comments - (Include information on re; <br />alp made prior to testinx and recommended Follow -ug for failed tests) <br />1 If the entire depth of the UDC is not tested, specify how much was tested If the answer to am of the questions indicated with an <br />asterisk ('r) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.