Laserfiche WebLink
Stite Addiless: <br />Iq <br />F. In -Tank Gauging / SIR Equipment: <br />of Testing /Servicing: % /�/ '�' <br />heck this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following: checklist: <br />❑ Yes <br />113 <br />No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes <br />❑ <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ <br />No* <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />' ❑ <br />No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />❑ <br />No* <br />Were all probes reinstalled properly? <br />❑ Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />a.e 9 AV OOC6N11 n, ucluw, ucscrl U nuw .IIID wile" InesC UCIICICIICIeS Wel'C of will be corrected. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />Complete the following checklist: <br />es <br />❑ No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑ N/A <br />(Check all that appl)) Simulated leak rate: g.p. .; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />es <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />s <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />es <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />1.►/A <br />or disconnected? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />jA <br />malfunctions or fails a test? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />® N/A <br />Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />d•• •••...-+.........•..,I ai...v.T, ucaa l Bvc uvrr nuu IT lull IfICSC Ucllcielll'1es were or will oe correctea. <br />H. Comments: <br />