Laserfiche WebLink
Ll <br />E <br />SWRCB, January 2002 <br />Test Method Developed By: <br />Page — of <br />5. SECONDARY PEPE TESTING <br />0 Piping Manufacturer R Industry Standard 0 Professional Engineer <br />0 Other (Specify) <br />Test Method Used: <br />Pressure <br />0 Other (Specify) <br />0 Vacuum <br />0 Hydrostatic <br />.0 off-*• <br />Equipment solution: <br />Naliln-, I <br />i <br />1. Length of Piping Run:�� <br />- <br />Method and location of <br />-piping-run isolation: <br />Wait time between applying <br />pressurelvacuum/water and <br />starting-tew <br />i <br />Test Start Time: <br />Test Duration: <br />WAN <br />Change in Reading (RrR,): <br />Comments — (inclide information on repWrs nzade pljor 10 tesfing, and recommendedfollow-upforfaa: led tests) <br />6 o n 4 <br />