My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
2300 - Underground Storage Tank Program
>
PR0231127
>
COMPLIANCE INFO_2002-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 1:48:44 PM
Creation date
6/23/2020 6:44:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2009
RECORD_ID
PR0231127
PE
2361
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
01
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231127_1612 W HAMMER_2002-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 6. PIPING SUMEP TESTING <br /> Test Method Developed By: 10 Sump Manufacturer 0 industry Standard professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: 0 Pressure 0 Vacuum Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: �� 1 �, (.. ,.� `r ?,4a { Equipment Resolution: o u2 <br /> Sump# sump# 7 sump# 3 Sump# <br /> Sump Diameter: c r r �,a t t h 11 <br /> Sump Depth: 1. :{` t s t <br /> Sump Material: /*,5 <br /> Height from Tank Top to Top of <br /> Hi est Piping Penetration: f� � <br /> Height from Tank Top to Lowest q1 <br /> Electrical Penetration: <br /> Condition of sump prior to testing: <br /> Portion of Sump Tested' 4uq /,-r -I't. yl e,;-Lq is / ®" Wet le-,v Z-4,�r: 17 <br /> Does turbine shut down when �} <br /> sump sensor detects liquid(both Yes 0 No 0 NA Yes 0 No 0 NA es 0 No 0 NA 0 Yes 0 No ❑NA <br /> product and water)?* <br /> Turbine shutdown response time VIs system <br /> shutdown?rogrammed for fail-safe .Yes 0 No ❑NA Yes 0 No 0 NA es D No 0,NA 0 Yes G N � DNA <br /> Was fail-safe verified to be 0 Yes CYNo 0 NA 0 Yes No 0 NA 0 Yes ^o 0 NA 0 Yes ❑ o \❑NA <br /> operational?* <br /> Wait time between appi tng i <br /> pressure/vacuun/wat d starting <br /> test: lt� ;rP :�r �F fdr,� �ecc��� �bI-rluf� `S <br /> Test Start Time: ,2; 2-e) <br /> Initial Reading(111) <br /> Test End Time: -2—, 5 0 ` <�.S 2, to <br /> Final Reading(RF) 15t k-, i�'tkt ,�° �+ ��' ,41?/l 'r�S� <br /> Test Duration: r>. <;� <br /> Change in Reading(RF-Ri): <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: 0 Pass [] Fail a-Pass 0 Fail Pass D Fail �0 Pass ❑ Faill <br /> Was sensor removed for testing? es 0 No 0 NA Yes 0 No 0 NA es 0 No 0 NA Yes 0N 0 N <br /> Was sensor properly replaced and I <br /> verified functional after testin ? Yes 0 No 0 NA es 0 No 0 NA es 0 No 0 NA LF1 Yes C No C N <br /> Comments— (include information an repairs made prior to testing, and recommended ollow-y for failed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to aLiy of the questions indicated with an <br /> asterisk(*) is"NO"or"NA", the entire sump must he tested. (See SWRC13 LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.