Laserfiche WebLink
0 0 RECEIVED <br />SWRCB, January 2002 Page of <br />6. PIPING SUMP TESTING All G 2 5 2014 <br />Test Method Developed By: ❑ Sump Manufacturer ❑ Industry Standard X Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum VAyarEfl!�RTMENT <br />❑ Other (Specify) <br />Test Equipment Used: Caldwell Level Change Indicator <br />Sump # 1-91 Sump # 2-87 <br />Equipment Resolution: .002 <br />Sump # 3 -Diesel Sump # <br />Sump Diameter: 42" <br />42" <br />42" <br />Sump Depth: 45" <br />46 'h" <br />47" <br />Sump Material: Fiberglass <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of 16 '/2" <br />Highest PipinE Penetration: <br />18" <br />16" <br />Height from Tank Top to Lowest 24 %2" <br />Electrical Penetration: <br />24" <br />18" <br />Condition of sump prior to testing: Dry <br />Dry <br />Dry <br />Portion of Sump Tested' Water Level 27" <br />Water Level 28" <br />Water Level 27" <br />Does turbine shut down when <br />sump sensor detects liquid (both Yes <br />product and water)?` <br />Yes <br />Yes <br />Turbine shutdown response time Not Alarmed <br />Not Alarmed <br />Not Alarmed <br />Is system programmed for fail-safe Yes <br />shutdown?" <br />Yes <br />Yes <br />Was fail-safe verified to be No <br />No <br />No <br />-operational?* <br />Wait time between applying water 5 Minutes <br />and starting test: <br />5 Minutes <br />5 Minutes <br />Test Start Time: 9:55 <br />10:05 <br />10:55 <br />Initial Reading (RI): .001 <br />.001 <br />.001 <br />Test End Time: 10:25 <br />10:35 <br />11:25 <br />Final Reading (RF): .001 <br />.001 <br />.001 <br />Test Duration: 30 Minutes <br />30 Minutes <br />30 Minutes <br />Change in Reading (RF -RI): 0 <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: .005/30 Minutes <br />.005/30 Minutes <br />.005/30 Minutes <br />Test Result: „ Pass <br />Pass <br />Pass <br />Was sensor removed for testing? Yes <br />Yes <br />Yes <br />Was sensor properly replaced and Yes <br />verified functional after testin ? <br />Yes <br />Yes <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />