Laserfiche WebLink
11 <br />SWRCB, January 2006 <br />This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br />printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />R"alwills 10:01139d ir.Zt[0161 <br />Facility Name: PARKWOOD SHELL Date of Testing: 05-05-14 <br />Facility Address: 1612 W HAMMER LANE STOCKTON CA 95209 <br />Facility Contact: PAUL Phone: 209-931-3549 <br />Date Local Agency Was Notified of Testing A-14-14 <br />Name of Local Agency Inspector (f present during testing): SAN JOAQUIN CO Thuy <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: AFFORDA TEST 4162 nd Street Galt, CA 95632 (209) 744-0112 Fax: (209) 744-0116 <br />Technician Conducting Test: ❑ Lyle D. Nimmo ❑ Zane A. Nimmo ❑ David A. Winkler ® Felix G. Ramirez <br />5249115 -UT 5263322 -UT 5263373 -UT 5273934 -UT <br />11 Credentials': ® ICC Service Tech. ® SWRCB Tank Tester <br />3. SPILL HIJCKET TESTING INFORMATION <br />Test Method Used: ® Hydrostatic ❑ Vacuum ❑ Other <br />Test Equipment Used: TAPE / <br />H2O <br />Equipment Resolution: 1/16 <br />-77 <br />Identify Spill Bucket (By Tank <br />Number, Stored Product, etc.) <br />1 87 <br />2 91 <br />3 DIE <br />4 <br />Bucket Installation Type: <br />® Direct Bury <br />❑Contained in Sump <br />® Direct Bury <br />❑Contained in Sump <br />® Direct Bury <br />❑ Contained in <br />Sump <br />❑ Direct Bury <br />❑ Contained in <br />Sum <br />Bucket Diameter: <br />11 <br />11 <br />11 <br />Bucket Depth: <br />14 1/2 <br />14 1/2 <br />14 <br />Wait time between applying <br />vacuum/water and start of test: <br />- <br />Test Start Time (TI): <br />1015 <br />1015 <br />1015 <br />Initial Reading (RI): <br />141/2 <br />141/2 <br />14 <br />Test End Time (TF): <br />1115 <br />1115 <br />1115 <br />Final Reading (RF): <br />141/2 <br />141/2 <br />14 <br />Test Duration (TF — TI): <br />I HOUR <br />1 HOUR <br />1 HOUR <br />Change in Reading (RF - R,): <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />ZPass ❑ Fail <br />E Pass []Fail <br />® Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />OPW BUCKETS <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />Technician's Signature: Date:05-05-14 <br />' State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements <br />may be more stringent. <br />