Laserfiche WebLink
E <br />E <br />SWRCB, January 2002 Page _ of <br />8. FILL RISER CONTAINMENT SUMP TESTING <br />Sump Diameter: <br />Sump Depth: <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to <br />testing: <br />Portion of Sump Tested <br />Sump Material: <br />Wait time between applying <br />water and starting test: <br />Test Start Time: <br />Initial Reading (Ri): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold or Criteria: <br />Test Result: <br />Is there a sensor in the sump? <br />Does the sensor alarm when <br />either product or water is <br />detected? <br />Was sensor removed for testing? <br />Was sensor properly replaced and <br />I verified functional after testipgj_ <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />0 <br />7t P <br />ENVIR&N L <br />ENT <br />