Laserfiche WebLink
TEST DATE: 03/16/01 <br />CLIENT:WENDT CONSTRUCTION <br />Tank ID: 3 (5x) 3 <br />Product: REG UNLEAD <br />Capacity in gallons: 5,076 <br />Diameter in inches: 96.00 <br />Length in inches: 164 <br />Material: DW STEEL <br />COMMENTS <br />TANK INFORMATION ANI <br />ZliIp 9y <br />8900 SHOAL CREEK, BUILDING 200 <br />AUSTIN, TEXAS 78757 (512) 451-6334 <br />Tank manifolded: No <br />Vent manifolded: YES <br />Vapor recovery manifolded: YES <br />Overfill protection: YES <br />Overspill protection: YES <br />Installed: ATG <br />CP installed on: / / <br />Dipped Water Level: <br />0.00 0.00 <br />Dipped Product Level: <br />82.50 82.50 <br />Probe Water Level: -0.006 <br />-0.003 <br />Ingress Detected: Water N <br />Bubble N UllageN <br />Test time: <br />12:18-13:48 <br />Inclinometer reading: <br />1.00 <br />VacuTect Test Type: <br />Multiple tanks <br />VacuTect Probe Entry Point: <br />Fi11 <br />Pressure Set Point: <br />-1.00 <br />Tank water level in inches: <br />0.00 <br />Water table depth in inches: <br />154.00 <br />Determined by (method): <br />OBSERVATION PORT <br />Result: <br />PASS <br />COMMENTS <br />DW DRY ANNULER MAG PROBE <br />Material: DW FIBERG <br />Diameter (in): <br />2.0 <br />Length (ft): <br />100.0 <br />Test psi: <br />50 <br />Bleedback cc: <br />70 <br />Test time (min): <br />30 <br />Start time: <br />10: 07 <br />End time: <br />10:37 <br />Final gph: <br />0.000 <br />Result: <br />PASS <br />Pump type: <br />PRESSURE <br />Pump make: <br />FE PETRO <br />COMMENTS <br />EST RESULTS <br />WORK ORDER NUMBER2215984 <br />SITE:CHEVRON <br />Bottom to top fill in inches: <br />140.0 <br />Bottom to grade in inches: <br />150.0 <br />Fill pipe length in inches: <br />44.0 <br />Fill pipe diameter in inches: <br />4.0 <br />Stage I vapor recovery: <br />DUAL <br />Stage II vapor recovery: <br />BALANCE <br />New/passed Failed/replaced New/passed Failed/replaced <br />L.D. #1 L.D. #1 L.D. #2 L.D. #2 <br />Make: <br />Model: <br />S/N: <br />Open time in sec.- <br />Holding <br />ec:Holding psi: <br />Resiliency cc: NOT NOT <br />Test leak rate ml/m: TESTED TESTED <br />Metering psi: <br />Calib. leak in gph: <br />Results: <br />COMMENTS <br />NOT NOT NOT <br />TESTED TESTED TESTED <br />Impact Valves Operational: YES <br />Printed 03/20/2001 <br />