My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
642
>
2300 - Underground Storage Tank Program
>
PR0231148
>
COMPLIANCE INFO_1985-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2021 4:42:26 PM
Creation date
6/23/2020 6:44:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2003
RECORD_ID
PR0231148
PE
2361
FACILITY_ID
FA0000799
FACILITY_NAME
STOCKTON MOBIL #1
STREET_NUMBER
642
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906035
CURRENT_STATUS
01
SITE_LOCATION
642 N HUNTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231148_642 N HUNTER_1985-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
396
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEW UST( INSTALLATION INSPECTION RECORD i <br />FACILITY NAME: <� � t �Gt � � (G , C � � a ��1LG�k ADORESS: �. 6Z -; 0.4-1 F/ / <br />FAC.LITY ID# FAArmjjy T NK* ULA TANK MCOEL/MATERIAL: <br />CAPACITY: PRODUCT: R.E-H.S: <br />INITIAL INSPECTIONS <br />3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br />VACUUM: SOAP: PSI: HRS/MIN: 3RINE(LIQUID ANNULAR): OTHER: <br />14. PRIMARY TANK TEST: PSI: HRS/MIN: <br />5. TANK APPROPRIATELY PLACED WITH APPROVED 3ACKFTLL (API/P£I) <br />PIPING INSPECTIONS <br />A <br />I <br />PERFORMANCE TEST FOR "ALL" MONITORING PROBES 1 u,} �� 4- r (CCR 2632 (c) (2)) <br />P <br />N <br />ALL TANKS TO BE INSTALLED AND TESTED IN ACCOROANCE <br />P <br />I <br />WITH MANUFACTURER WRITTEN SPECIFICATIONS <br />R <br />T <br />I16. PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF (CCR 2636 (9)) <br />0 <br />I <br />17. BALL FLOAT VALVES INSTALLED <br />V <br />A <br />I18. OVERFILL PROTECTION INSTALLED/APPROVED (CCR 2635 (b) (2)) <br />E <br />L <br />19. TANK ACCESS PORTS BROUGHT TO GRADE (LOCXED AND WATERTIGHT) APT <br />D <br />S <br />I20. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (a) (5)) <br />ITEM OR EQUIPMENT INSPECTED <br />DATE <br />I22. <br />NC" FUN COMPLETED AND SUBMITTED (CCR 2635 (d)) <br />23. MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2630-26.36) <br />1. UST PUNS SUBMITTED/ FEES PAID (H+S CODE 25287) <br />2. UST INSTALLATION PLANS APPROVED <br />INITIAL INSPECTIONS <br />3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br />VACUUM: SOAP: PSI: HRS/MIN: 3RINE(LIQUID ANNULAR): OTHER: <br />14. PRIMARY TANK TEST: PSI: HRS/MIN: <br />5. TANK APPROPRIATELY PLACED WITH APPROVED 3ACKFTLL (API/P£I) <br />PIPING INSPECTIONS <br />FINAL !NSPECTION71. // 4 0, /j Ak <br />16. PRIMARY PIPING TEST (MINIMUM 40 PS1130 MIN) (CCR 26.36 (e)) <br />PERFORMANCE TEST FOR "ALL" MONITORING PROBES 1 u,} �� 4- r (CCR 2632 (c) (2)) <br />7. SECONDARY PIPING CONTAINMENT TEST PSI: HRS/MIN: OTHER: (CCR 2636 (e)) <br />14. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (c) (2)) <br />I8. <br />LAKE -icST ON ALL SUMPS (24 HR. MINIMUM) HRS: (CCR 2635 (a) (4)) <br />15. PERFORMANCE TEST OF LINE LEAK DETECTION (CCR 26433 Cc) (1)) <br />9. UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED PEI <br />I16. PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF (CCR 2636 (9)) <br />I10. OVERSPILL PERFORMANCE TEST (CCR 2635 (b) (1) (C)) <br />17. BALL FLOAT VALVES INSTALLED <br />11. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2636 (b)) <br />I18. OVERFILL PROTECTION INSTALLED/APPROVED (CCR 2635 (b) (2)) <br />I12. PIPING SLOPES TO COLLECTION SUMP (CCR 2636 (c)(1)) <br />FINAL !NSPECTION71. // 4 0, /j Ak <br />CUIMENTS <br />`FA-AW«M <br />EH23--006 9/95 T � <br />PERFORMANCE TEST FOR "ALL" MONITORING PROBES 1 u,} �� 4- r (CCR 2632 (c) (2)) <br />14. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (c) (2)) <br />15. PERFORMANCE TEST OF LINE LEAK DETECTION (CCR 26433 Cc) (1)) <br />I16. PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF (CCR 2636 (9)) <br />17. BALL FLOAT VALVES INSTALLED <br />I18. OVERFILL PROTECTION INSTALLED/APPROVED (CCR 2635 (b) (2)) <br />19. TANK ACCESS PORTS BROUGHT TO GRADE (LOCXED AND WATERTIGHT) APT <br />I20. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (a) (5)) <br />(21. MONITORING PLAN, RESPONSE PLAN AND LOG 300K ON SITE (CCC 2632 (d)) <br />I22. <br />NC" FUN COMPLETED AND SUBMITTED (CCR 2635 (d)) <br />23. MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2630-26.36) <br />I24. ALL =XDITIONS MET; FACILITY PERMIT ISSUED (H+5 CODE 25284) <br />CUIMENTS <br />`FA-AW«M <br />EH23--006 9/95 T � <br />
The URL can be used to link to this page
Your browser does not support the video tag.