Laserfiche WebLink
NEW UNOERGROAWTORAGE TANKS - PLAN ADDITION/dWECTION SH <br />The following checked and/or underlined items are to be addressed on plans: <br />GENERAL <br />c ( 1. Provide the name and address of the facility. at �'/• i• , /id -13 4'Orfi <br />2. Provide the name, address, and phone numbers of the contractor(s), ficility <br />owner(s), and operator(s). Iv. -,6 <br />ol- 3. Provide four complete sets of plans. (One to be retained by this office). <br />Include specification sheets, equipment brochures, monitoring, and response <br />plans. <br />0/L- 4. Provide plans to scale in nonerasable blueprint. <br />CONSTRUCTION STANDARDS <br />1, <br />I. Location(s) and number of tanks. 3 A-,"43, 1P«_S_, Pi,/9-/ <br />Type of tank(s) to be installed. 7o o - <br />A. Steel clad with fiberglass reinforced plastic. <br />1. 35,000 to 40,000 yolt Holiday Test required before "setting tank(s) <br />in ground. /qf8��,s_ <br />B. Fiberglass <br />1. Striker plate dimensions and materials. <br />o/c 2. Striker plates under all accessible openings. P1,C -G <br />C. Nonclad steel <br />1. Cathodic protection provided (including nuts, bolts, washers, etc.). <br />a. Approved by a corrosion engineer or NACE ,technician. <br />b. Document stating inspection method and frequency (Minimum semi- <br />annual inspection required). <br />D. Other types of tanks <br />1. Construction specification standards for durability. <br />�t oy41• �r-el , nt A�5-.; 6�0O 'QeadP6' <br />LL 3. Tank Capacity (List specific gallonage). uhf 6= �a;`0 <br />s_� f)V 3 re r/" � �i- ®f C _g <br />GSC 4. Contents to be stored in each tank (Be specific)."`'��` r U--" r'"e`" u� <br />A. Verification of product computability with the tank(s). piping, monitoring <br />device(s), epoxy or silicone glues, etc. -DOOR lvoro vnav uel <br />1. List testing organization and approval. UL_ <br />5. Provide manufacturers written installation instructions. (Include all piping, <br />monitors, tanks, etc. <br />Note - NFPA 30 Test required before covering tank and systems. NFPA 30 Test <br />o u is required—on BOTH the Primary and Secondary containment systems. <br />Double walled tanks using pressure or vacuum testing to monitor annular <br />space are exempt from testing secondary container. <br />C,A�. Note - NFPA 329 "Precision Test" required upon -comp-letion of installations. <br />neatest result copy to be sent directly to this department from the <br />�y�' testing company. <br />