My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
642
>
2300 - Underground Storage Tank Program
>
PR0231148
>
COMPLIANCE INFO_1985-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2021 4:42:26 PM
Creation date
6/23/2020 6:44:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2003
RECORD_ID
PR0231148
PE
2361
FACILITY_ID
FA0000799
FACILITY_NAME
STOCKTON MOBIL #1
STREET_NUMBER
642
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906035
CURRENT_STATUS
01
SITE_LOCATION
642 N HUNTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231148_642 N HUNTER_1985-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
396
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.y OPTION 1A <br />ARTICLE 3. SECTION 2631 <br />MOTOR VEHICLE OR NONMOTOR. VEHICLE FUEL TANK <br />6V"ZP1KUW1V,N STA DARDS <br />Y <br />1. Seconds containment provided. �� �� <br />2. Primary c tainers shall be product tight. �`�� <br />3. Secondary c tainers <br />A. Thicknes density, composition, and product compatibility. <br />B. Sized to c ntain unauthorized releases for sufficient time to al ow <br />detection a d removal. <br />4. Secondary container volumetric requirements <br />A, Single primary ontainer - 100%. <br />B. Multiple primary ontainers . 150% of largest primary container or <br />lOX above aggrega <br />1. Document antero <br />5. Secondary containers open\ <br />A. Volumetric requirement <br />primary container volui <br />compatibility <br />rainfall. <br />24 hours of 25 year storm in addition W <br />6. Pore space of granular materia used as backfill for the primary containers. <br />A. Refer to Section 2631(g). <br />7. Secondard container equipped with collection system. <br />A. Designed to: <br />I. Accumulate <br />2. Temporarily store <br />3. Permit removal of: <br />a. Precipitation <br />b. Subsurface infiltration <br />c. Released hazardous substance from primary container(s). <br />8. Floor of Secondary container <br />A. Constructed on firm base <br />B. Sloped to collection sump (1/" per foot . <br />1. One or more access casings installed "n sump <br />a. Sized to allow removal of collecte liquid <br />b. Extend to ground surface <br />c. Perforated in sump region. <br />d. Covered with a locked waterproof cap r within a secured facility <br />e. Thick enough to withstand anticipated tresses <br />f. Construction materials: <br />1) Are not weakened -by stored product <br />2) Will not donate, capture, or mask co stituents to be analyzed. <br />9. Membrane liner specifications: <br />A. Refer and comply with Article 3, Section 2631 j, k, 1, and m. <br />
The URL can be used to link to this page
Your browser does not support the video tag.