Laserfiche WebLink
a <br />OPTION 2A <br />ARTICLE 3, SCTPON 2633/2634 <br />MOTOR VEHrCLE FUELS ONLY <br />CONSTRUCTION <br />Requirements: �� s tc a <br />A. Approved tank construction material O J b Pb�s� <br />B. Leak interception and detection system which complies with Article 3, <br />Section 2631(c). <br />4- Membrane liners must comply with Article 3, Section 2633(e), (11, (2), <br />(3)9 (4),(6) and are only allowed for piping systems (Department Policy) <br />Demonstrate that the leak interception and detection systems protects <br />vim° <br />LP ground water from contamination (4)' (5), (6), (T), (Article 3, Section 2633(f), (1), (2), (3), <br />E. Pressurized piping systems must be installed with a leak detector that is <br />capable of automatically shutting off the product pumps. <br />1. single w omponent "tank or piping" requires daily inventory <br />reconc nd annual precision tests as part of the monitoring <br />prog m. <br />F. Before covering, the tank(s) and system(s) must be tested to NFPA 30, <br />t <br />Standards. <br />c "( G. Before use - the tank(s) and system <br />NFPA 329, (s ) must b e tested in accordance to <br />--profile of vadose zone if membrane liners are used. <br />OPTION 26 <br />ARTICLE 3, SECTION 2634 <br />MOTOR VEHICLE FUELS ONLY <br />MONITORING <br />1. Requirements (leak interception and detection system(s)). <br />ap'� <br />Floor must be constructed on a firm base and sloped to a collection sump. <br />Access casings must be installed in accord <br />34 (c) (1 thru 6), (d) (l)® ante to Article 3, Section <br />C. Submit w toning and response plan as stated in Article 3, <br />Section 2634 (d) (1-3j; e) <br />D. Hard wiring of electronic monit <br />E. Provide manufacturer's written installat�ems is required. <br />actions. <br />� .� V Cf bo ((,oil k <br />