Laserfiche WebLink
12,13,64 17°33 <br />fy p <br />he STEILSAFFITY GAON measures <br />'e exact ilimount of liquid In your tank, <br />ccurate to 1110th of I%. Any shortage <br />r leakage Is determined Immediately. <br />undetected, <br />ISLAII in the loss of • • of <br />ollars of product. Worse <br />!aks lead to i ♦ ground -water, <br />liabilityontaminated $oil, explosions or fire, <br />ie • • costs <br />eGome staggering. <br />HE STEIL SAFETY GAGE <br />servedas the Petroleum • <br />iependably • over •. <br />,ianufactures the only mechanical <br />)age listed by Underwriters Laboratory. <br />or pipe <br />bushing Is required). <br />The patented bell Inside the manhole traps <br />the upcoming vapors from the ground and <br />condenses them, dropping them back into <br />the ground and prevents these vapors from <br />reaching the gage head within the cone. <br />The 9" sweatless' manhole and cover are heavy <br />cast iron with patented polyethylene bell <br />welded inside. The bell has a 5" opening to fit <br />around a 4" standard riser pipe. This houses <br />the entire Steil Safety Gage unit, keeping It <br />clean and dry in all kinds of weather, <br />The patented dehydrator is the heart of the Stell <br />Safety Gage. It seals off the pulley area from <br />the tank vapors to provide a clear and accurate <br />readout at all times. <br />If possible, Install gage above ground In <br />a remote area which will save the cost of a <br />manhole and make snow removal unnecessary. <br />With proper installation, this skillfully designed, <br />quality -constructed equipment is capable of <br />giving many years of dependable service. <br />a3 <br />.. .. ..... .._, ..� :, .. .�: � ��w.. s.MN�^^^'ns....rv�.r,.w-we�..v �. .y•...... �... ...�.wsn1'Y... ..,.n•e-,7p.- <br />