Laserfiche WebLink
8. a. Describe the method that will be utilized to purge andlor inert the tank(s} <br />-tea R-f—=m4r, N 04/ F -j SL.. <br />b. Zank/Piping Hauler. ''PkQo4c.' <br />l.1 <br />t4 P - <br />Name <br />Address City 014 144 Ip <br />7 <br />Phone No.( k0 ) <br />C. Tank/Piping Disposal Site: <br />Name r- . C. t . <br />Address- city R�CJAMOQO cf4 Ip <br />Phone No.( T5 k 0 ) - <br />EPA Mf Of transported to a permitted TSD facility) C 44 0 0-0,--)4 io (`o �31"-) 2- <br />9. Is the sampling firm an independent third party from the contractor? YES [a/ NO [ I <br />9a. Describe, in detail, how the soft and/or water sample(s) beneath the tank and piping will be obtained: <br />SOIL- G-6'-MP� V-i%LL- Ze— 1-1 CJ' 2. AdLot-16i <br />10. Describe how the excavation will be backfilled with suitable material upon removal: <br />11. Handling of excavated solh <br />a) What material will be used to line the tank pit and cover the stockpile? <br />'ro <br />b) What will be the final destination of the excavated stockpile? <br />NF--'vo to 13� <br />'5TrF—, <br />c) Contaminated Soll Hazardous Waste Hauler. <br />Address A,4f—=. City-5!♦� MP4�Zn rj — zip <br />PhoneNo.(,&-,o <br />EH 23 046 (Revised 08/13199) Page 5 <br />